18
INSTALLER’S CHECK LIST
You must test the cooker after installation before you hand
it over to the customer. You must have a manometer and a
connecting tube.
The following checks have to be made to commission the
cooker and to activate the warranty:
INSTALLATION CHECK
Have the supplied blue washers and fittings been used?
YES
NO
Has a leak test with soapy water been performed?
YES
NO
Is the regulator set for the correct gas type and pressure
YES
NO
Are the jet sizes correct for the gas type?
YES
NO
Is the product earthed & wiring polarity correct to eliminate
flickering of indicator lights?
YES
NO
Has the power cable been checked to ensure it is not
touching the product?
YES
NO
Are the burner parts sitting correctly?
YES
NO
OPERATION CHECK
Do all the burners ignite and stay on?
YES
NO
Is the flame blue and appropriately sized?
YES
NO
Does the oven burner ignite and stay on?
YES
NO
Has the oven been operated and been seen to reaching
temperature?
YES
NO
Model Number
Date of installation
Name of installer
Signature
Licence number
GLEM GAS AUSTRALASIA
P.O.Box 63 Blaxcell PO South Granville NSW 2142
Phone: 02 9721 2755 Fax: 02 9721 2766
www.glemgas.com.au
Email us [email protected]