background image

K

IT

: P/N 938-02000-01 

K

IT 

I

NSTRUCTIONS

: P/N 063-09019-01

 

 

R

EVISION

D

ATE

8/28/08  

P

AGE

6

 

2008

©

 Copyright Glasair Aviation LLC, Arlington, Washington All rights reserved 

Position #10 

nutplate jig 45° 

to corner 

Countersink #40 

holes for 

AN426AD3-3 rivets

 
Using standard procedures, install a K1000-3 

nutplate

 at each hole 

on the 

inside

 of the air box.  Use 3/32” AN426AD3-3 

flush-head rivets

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание GLASTAR

Страница 1: ...s fresh air into the cabin through two small but very effective NACA style scoops on the fuselage sides Airflow can be controlled by the pilot and passenger using two adjustable eyeball ventilators Th...

Страница 2: ...tubes and the cabin air vent boxes Therefore treat this location as provisional until you have verified clearance as described below Tape the template in position on the exterior of the fuselage shell...

Страница 3: ...938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 3 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 1 POSITIONING THE AIR BOX FOR INSTALL...

Страница 4: ...the aircraft to receive the air drawn into the system through the NACA scoops The air box in turn provides mounting surface for the eyeball ventilators Prepare the air box for installation by first tr...

Страница 5: ...all ventilator in the square aft face of the box Find the center of the face by marking diagonal lines from the corners and then use a 2 hole saw to cut a circle centered on that point Finally fit the...

Страница 6: ...08 Copyright Glasair Aviation LLC Arlington Washington All rights reserved Position 10 nutplate jig 45 to corner Countersink 40 holes for AN426AD3 3 rivets Using standard procedures install a K1000 3...

Страница 7: ...TIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 7 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved Cleco K1000 3 nutplates in position Completed Left Right Use hand riv...

Страница 8: ...layout of the air box relative to the cage Align the pre molded NACA scoop section of the air box with the cutout you made in Step 1 Verify that the air box clears the cage structure and relieve the...

Страница 9: ...batch of thick resin milled fiber mixture and spread it evenly over the air box mounting plate Position the box against the fuselage side and use four clecos to pin it in place Then using the NACA sco...

Страница 10: ...l the way around the cutout At the aft edge of the cutout increase the depth of this trough to about Once you have removed the foam core as described above fill the resulting troughs back in with Bond...

Страница 11: ...T P N 938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 11 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 4 FINISHING THE NACA SCOOP EDGE...

Страница 12: ...hown in Figure 5 use NAS603 8P round head machine screws to install the eyeball ventilator in the air box Note If you intend to upholster over your air boxes you will want to do so before installing t...

Страница 13: ...N 938 02000 01 KIT INSTRUCTIONS P N 063 09019 01 REVISION C DATE 8 28 08 PAGE 13 2008 Copyright Glasair Aviation LLC Arlington Washington All rights reserved FIGURE 6 NACA SCOOP TEMPLATE FULL SIZE 6 0...

Отзывы: