Step 2: Prepare the Air Box for Installation
The air boxes are installed inside the fuselage shell on each side of
the aircraft to receive the air drawn into the system through the
NACA scoops. The air box in turn provides mounting surface for
the
eyeball ventilators
.
Prepare the air box for installation by, first trimming the edges down
to the scribe line provided. This will result in a bonding flange
around the entire perimeter of the part approximately
5/8”
wide.
Second, use coarse sandpaper, to remove the gelcoat from the
flange all the way around the part.
Sand bonding
flange with 36 grit