5.
Verify the metal sleeve is still on the 19mm bolt inside the shoulder.
Attach the new arm to the shoulder using the 17mm and 19mm bolts,
tightening both evenly.
6.
With the awning open about 18”, unband the high tension arm very carefully.
Slowly guide it into position on the lead rail and fasten it in place with the 5mm
allen head screw.
7.
Adjust the arms’ pitch angle to match the others by rotating the head of the
pitch-adjustment screw (Figure 13, screw A) as follows; rotate in a clockwise
direction to raise the arm, or rotate counterclockwise to lower it. Fully tighten
both lock nuts on the shoulder assembly. Please refer to the “ADJUSTING THE
PITCH ANGLE” section of this manual.
8.
The elbow height may need to be adjusted, using the 17mm and 19mm bolts
(Figure 11).
Page
46
of
49
Содержание GG750
Страница 6: ...Page 6 of 49 98GC779 98GC1146C 98GC780B...
Страница 7: ...Page 7 of 49 98GC104 98GC1063 98GC229 98GC783B 98GC781B...
Страница 10: ...Page 10 of 49 Figure 1...
Страница 12: ...Page 12 of 49 Figure 2...
Страница 19: ...Page 19 of 49 C Motion Sensor 98GC779G and LED Connections 4 conductor power supply...
Страница 22: ...Page 22 of 49...
Страница 26: ...Page 26 of 49...
Страница 28: ...Page 28 of 49 Motion Sensor Installation view Fig 4 Fig 5...
Страница 29: ...Page 29 of 49 E Wiring Diagram Fig 6...
Страница 35: ...Figure 12 Page 35 of 49...
Страница 41: ...Figure 16 Figure 17 Page 41 of 49...
Страница 47: ...Page 47 of 49...