23
Picture 1
Installation
The unit is normally installed on the Lead Rail facing the location of the motor approximately 5”
from the end of the Lead Rail using two self-tapping sDCews. For field installation please refer
to the instructions shipped with the unit.
Programming
NOTE:
•
Before starting this procedure the Receiver must be without power (OFF) for at least 10 seconds.
•
During the programming function the interval between each step required, must be less than 10 seconds.
Picture 2