10 |
P a g e
Duration:
4.5 hours (based on two installers)
Prior to beginning installation sequence
:
1. Insert end of crank into manual override receiver, located at extreme end of awning.
2. Push in and rotate handle 1/4-turn clockwise. Let handle drop approximately 1/2”. (Handle
should lodge in receiver and awning may now be extended/opened.)
3. Extend awning approximately 12” by turning handle clockwise (see Fig. 1); confirm that
awning shoulders are in proper locations; make note of shoulder locations; and retract/close
awning by turning handle counter-clockwise.
NOTE: Roof mount awnings will have the manual override receiver positioned on the
top of the awning.
(FIGURE 1)
WARNING
ALL ELECTRICAL WORK MUST CONFORM TO APPLICABLE
ELECTRICAL CODES AND STANDARDS.
•
Turn off power before beginning any electrical work.
•
Please consult your RV’s wiring diagram to locate any wiring
prior to any drilling or any installation procedures.
•
Ensure that placement of controls, cables, and wires are not
in any way obstructed. This can damage the components and
obstruct electrical current.
•
Use only certified components.
Содержание G-1500
Страница 11: ...14 P a g e ...
Страница 41: ...44 P a g e ...
Страница 42: ...45 P a g e ...
Страница 43: ...46 P a g e ...
Страница 44: ...47 P a g e ...
Страница 45: ...48 P a g e NOTES ...