background image

 

 

Operative Manual 

MO079-IT 

15/06/12 

Rev.0 

Pag. 6 di 16 

 

 

 

2.

 

Product Installation 

Before installing the Product, make sure that all the packages are present and in good condition, without any 
transport-related damage, and that the contents correspond to what is specified above. 
Claims will be considered only if the seller or the forwarder are  informed immediately. Each claim must be 
in writing. Goods are always carried at the buyer’s risk.  
Keep the original package in case the lamp must be sent back. 

 

2.1 Installation mobile version 

1.

 

Insert the lamp into the upper hole of the pipe. 

2.

 

Screw down the knob, taking care of the thread 

3.

 

Connect  the  power  cable  plug  to  the  network  line  (please  check  that  the  network  line  is 
equipped with the ground cable). 

 

2.2 Installation wall version (S/12 MED fixing) 

1.

 

Fix the clamp S/12 MED on the wall using 3 expansion screws. 

2.

 

Insert the lamp into the upper hole of the wall clamp S/12MED. 

3.

 

Follow points 2 and 3 of paragraph 

2.1

 

2.3 Installation wall version (rail bar fixing) 

1.

 

Fix the rail bar supports using 2 expansion screws.  

2.

 

Put the clamp on the bar and tighten the handle. 

3.

 

Insert the lamp into the upper hole of the rail clamp 

4.

 

Follow points 2 and 3 of paragraph 

2.1

 

2.4  Installation table version (S11 fixing) 

1.

 

Fix the clamp S/11 to the table tighten the screwed pivot. 

2.

 

Insert the lamp into the upper hole of the table clamp 

3.

 

Screw, using a screwdriver, the screw on the back of the clamp,  

4.

 

Follow point 3 of paragraph 

2.1

 

2.5

 

First starting 

At this point is possible to power the Product to check its correct functioning.  
Follow the steps below: 
1-

 

 Press the green switch of the base; 

2-

 

 Press the I/O keyboard on the front side of the reflector. 

 

2.6

 

Installation verification and Product testing operations before use 

The following prescriptions are to be considered compulsory during verification of the installation, since they prove 
the correct execution of all the points set out. For such reason it is necessary to tick each point when it is treated.

 

1.

 

Check the suitability of the wall to the installation of the Product.   

 

2.

 

Check the right installation of the pivot into the clamp/stem 

 

3.

 

Make sure the movement mechanism works perfectly. Check the mechanical operation of the Product 
by directing and rotating

 

 

4.

 

After turning on the Product, it must emit light from the reflector 

 

 
  

    

Seal and signature of the installer:

 

 

 

 
 

 

Содержание PRIMALED

Страница 1: ...ation mobile version 6 2 2 Installation wall version S 12MED fixing 6 2 3 Installation wall version rail bar fixing 6 2 4 Installation table version S11 fixing 6 2 5 First starting 6 2 6 Installation...

Страница 2: ...alian edition of this operator s manual 1 General information The ME Medical Electrical EQUIPMENT to which this manual refers is a LAMP for diagnosis or observation For easier description such ME EQUI...

Страница 3: ...tion manual and user manual Transport is carried out by any road haulage contractor as long as they respect the following characteristics Temperature C 15 60 Humidity 10 75 Atmospheric pressure h Pa 5...

Страница 4: ...ential performance Collateral standard Electromagnetic compatibility Requierements and tests Classification with reference to article 9 and Annex IX of Directives 93 42 EEC and 2007 47 EC DURATION Sho...

Страница 5: ...ot above 40 of the net value of the product as indicated on the buyer s invoice GIMA s liability is expressly ruled out for indirect damages or consequential damages including cases of the lamp not be...

Страница 6: ...the bar and tighten the handle 3 Insert the lamp into the upper hole of the rail clamp 4 Follow points 2 and 3 of paragraph 2 1 2 4 Installation table version S11 fixing 1 Fix the clamp S 11 to the ta...

Страница 7: ...ions could cause glare and potential damage to the retina Never place and or hang anything on the Product Unless this precaution is taken positioning will not be reliable and the danger exists of such...

Страница 8: ...ic parts becoming fragile use only disinfectants with low alcohol content Dose the disinfectants so no liquids penetrate inside the lamp bodies and into the support arm system Clean the Product with a...

Страница 9: ...tch on Check the INPUT and OUTPUT 24V power supply voltage and the voltage of the electronic board terminal 24V 2 The Product does not remain in position See the attached instructions 3 The light flic...

Страница 10: ...240 Frequency Hz 50 60 Absorbed power VA 30 Light source N 12 Led x 1 4W LED light source duration h this datum can vary according to voltage peaks and the frequency of use 50 000 Light intensity con...

Страница 11: ...Operative Manual MO079 IT 15 06 12 Rev 0 Pag 11 di 16 8 Electrical diagram...

Страница 12: ...ngs used for domestic purposes provided the following warning is heeded Warning This equipment system is intended for use by healthcare professionals only This equipment system may cause radio interfe...

Страница 13: ...cial or hospital environment NOTE UT is the a c main voltage prior to application of the test level Immunity test IEC 60601 test level Compliance level Electromagnetic environment guidance Conducted R...

Страница 14: ...transmitter W Separation distance according to frequency of transmitter m 150 kHz to 80 MHz d 1 2 P 80 MHz to 800 MHz d 1 2 P 800 MHz to 2 5 GHz d 2 3 P 0 01 0 12 0 12 0 24 0 1 0 38 0 38 0 73 1 1 2 1...

Страница 15: ...to adjust the friction force in correspondence of rotational joints and therefore the consequent movement of movable arms ROTATION JOINTS Depending on the version of the device there is a different n...

Страница 16: ...Operative Manual MO079 IT 15 06 12 Rev 0 Pag 16 di 16 Note...

Отзывы: