Gillette SPH-120 Скачать руководство пользователя страница 3

PAGE 3 

THIS MANUAL CONTAINS IMPORTANT IN-
STRUCTIONS THAT MUST BE FOLLOWED DUR-

ING INSTALLATION, OPERATION, AND MAIN-
TENANCE OF THIS GENERATOR SET AND ALL 
ASSOCIATED EQUIPMENT.

 

 

Thoroughly read this operators manual before install-
ing, operating, or servicing your generator set.  Safe 
operation and best performance can be achieved 
only when this generator is operated and maintained 

properly. 
 

INTRODUCTION 

 
Thank you for your purchase of this 

SENTRY-PRO

 

automatic start/stop home standby generator set by 
GILLETTE GENERATORS, INC.  This generator set is 
intended for use as an alternative source of electric 

power to operate normally required household elec-
tric loads, during a utility power failure. 
 
This generator set has an all weather protected metal 
enclosure, 

MADE EXCLUSIVELY FOR OUTDOOR 

INSTALLATION

, and will operate on either vapor 

withdrawal liquid propane gas (LPG) or natural gas 
(NG).  

CAUTION:

 This generator does not comply 

with emergency power as defined in NFPA 70 of Na-
tional Electric Code. 
 

GILLETTE GENERATORS

 

has made every effort to 

present a modern, safe generator set that will give 
you a safe, clean supply of an alternative source.  

However, because each installation is different, it is 
impossible for this manual and GILLETTE to know and 
advise against all possible hazards.  The listings, 
warnings, and cautions in this manual and on tags and 

decals affixed to the generator set, are therefore, 

NOT ALL INCLUSIVE

.  If a certain procedure, work 

method, test method, or operating procedure is used, 
and is not recommended by GILLETTE, the person or 

company responsible for the generator modification, 
must assume all responsibility for safety and correct 
operation for the operator, service technician, and all 

others within generator area. 
 

READ YOUR GENERATOR SET MANUAL, PLUS 

SEPARATE ENGINE OPERATORS MANUAL AND 
AUTOMATIC TRANSFER SWITCH MANUAL 
CAREFULLY.  KNOW YOUR EQUIPMENT BE-

FORE YOU USE IT.  CONSIDER ANY POSSIBLE, 
POTENTIAL HAZARDS, BEFORE OPERATING 
YOUR GENERATOR SET. 
 

CAUTION: 

Only current licensed electrical and 

plumbing contractors should install your home 
standby generator.  All phase of installation must 
comply with all applicable local and national codes, 

industry standards, and regulations. 
 

THE GILLETTE WARRANTY IS AUTOMATICALLY 
NULL AND VOID WITHOUT THE USE OF LI-
CENSED ELECTRICIANS AND PLUMBERS, AND 

SO NOTED ON THE REGISTRATION FORM THAT 
IS TO BE RETURNED TO GILLETTE GENERA-
TORS, INC.

 

 

IMPORTANT SAFETY RULES 

 

The safety alert symbol

is used as a signal for 

possible danger, caution warning, or general hazard. 
 

DANGER:

 

Indicating a hazard that, if not avoided, 

will result in death or serious injury. 

 

WARNING:

 

Indicating a hazard that, if not 

avoided, could result in a death or serious injury. 
 

CAUTION:

 

Indicating a hazard that, if not avoided, 

might result in minor or moderate injury. 
 

NOTICE:

 

Indicating a hazard that, if not avoided, 

could result in general damage. 
 
Read and understand the above listed safety alert 
symbols, plus the following symbols that are used 

through out this manual. 
 
 

A LIST OF HAZARD SYMBOLS 

AND THEIR MEANINGS

 

SAVE THESE INSTRUCTIONS

 

Explosion 

Toxic Fumes 

Fire 

Chemical Burn 

Explosive Pressure 

Rotating Parts 

Hot Surface 

Electrical Shock 

Содержание SPH-120

Страница 1: ...OPERATION AND INSTALLATION GUIDE FOR MODELS SPS 100 SPH 120 SPS 120 SPV 160 GILLETTE GENERATORS AUTOMATIC POWER SYSTEMS...

Страница 2: ...tural Gas NG 12 13 Gaseous Dry Fuel System Liquid Propane Gas LPG 14 15 Prepare for Generator Operation 15 18 Access to Interior Battery Selection Installation Electricians Wiring Installation Final P...

Страница 3: ...procedure is used and is not recommended by GILLETTE the person or company responsible for the generator modification must assume all responsibility for safety and correct operation for the operator s...

Страница 4: ...AU TIONS Starting batteries are not furnished with your generator set but they are available through your installing contractor The home standby generator requires a Group 36 12 VDC fully charged batt...

Страница 5: ...running engine produces a poisonous gas from its muffler exhaust pipe This is an odorless in visible and colorless poison that cannot easily be detected Breathing carbon monoxide will cause fa tigue h...

Страница 6: ...ical output shows sparks smokes emits flames vibrates or shows any other abnormal operation Do not modify generator design Do not modify carburetion system as it is factory set for C A R B EPA emissio...

Страница 7: ...ibility of the sepa rate manufacturers of the ATS PRE INSTALLATION PLANNING The beginning installation requires some thought and planning The following illustrations are meant to fa miliarize reader w...

Страница 8: ...ther air intakes should be minimum 10 feet from exhaust end 6 Windows and doors on adjacent walls to be closed at all times during generator operation 7 Nearest roof overhang vent should be 10 feet fr...

Страница 9: ...best place for these two neutrals to meet generator and utility neutral is in the auto matic transfer switch However still connect gen set mechani cal ground to the stake All factory gen sets have a...

Страница 10: ...with the entire generator set 11 12 VDC battery charger Installer must connect 120 volt 1 phase utility power to this charger 12 Oil drain with flexible drain hose NOTE Change oil after every 50 hour...

Страница 11: ...to normal operation C Hour Meter Total hours of use and is used as service reminder D Main Line Circuit Breaker UL 146 circuit breaker will trip open upon short circuits or overloads KNOWYOUR SYSTEM C...

Страница 12: ...sure must be 6 to 8 inches water column 4 to 4 ounces and minimum 1000 BTU rating per cubic foot hour Figure 1 BTU Values based on 1000 BTU s per cubic foot Gas supplier may need to know Nat Gas consu...

Страница 13: ...l new installations plus any future repair or troubleshooting procedures must include a natural gas manometer test This test should be conducted after all other natural gas appliances have been turned...

Страница 14: ...135 cu ft can be de livered over a 50 ft distance with a 1 diameter fuel pipe INSTALLER S RESPONSIBILITY Use Figure 4 chart to learn cubic feet hour value of generator to be installed Use Figure 5 cha...

Страница 15: ...LPG tank are reasonably close 20 Ft to 50 Ft as it results in short runs for both electric wires and LPG fuel lines When these two identities are far apart always choose to locate generator as close t...

Страница 16: ...jobsite A fully charged battery must test at 12 5 13 0 volts DC Also the correct battery for models SPH 85 SPH 100 SPH 120 and SPV 160 must have lug terminals to match lug battery cables for a bolt to...

Страница 17: ...tery charger before working on battery terminals A battery can cause a chemical burn Before working on a battery follow safe procedures Wear full eye protection and protective clothing When battery el...

Страница 18: ...unction The generator will not ex ercise in this position TEST position will start the engine but will not dis connect utility power from the transfer switch This position is used for testing the gene...

Страница 19: ...re position this LPG venture For natural gas operation remove the carburetor flexible fuel line from LP stamped brass fitting and dead end brass cap from NG stamped brass fitting Attach fuel line to...

Страница 20: ...r switch ATS STEP 2 Turn the MODE SELECTOR switch located on the control panel from OFF RESET position to TEST position This will establish the first engine start cycle With the ENGINE RUNNING lamp lo...

Страница 21: ...rong enough to perform under this demanding scenario However if the load is 75 or more induc tive large motors UPS systems large air condition ers it may be necessary to install a time delay de vice a...

Страница 22: ...or Inspect the debris guard on engine air intake to insure no obstructions have accumulated Inspect radiator liquid cooled sets to insure no debris accumulation has occurred Some generator models have...

Страница 23: ...L CONNECTION THERE ARE TWO KNOCK OUT HOLES ON THE RIGHT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT GENERATOR END VIEW CONTROL DOOR PANEL THIS PANEL IS HERE TO HELP WITH INITIAL WIRING I...

Страница 24: ...POLY BASE AS SHOWN USING 5 16 18 HEX NUT TO LOCK BOLT IN PLACE INSTALL GEN SET AND METAL BASE ONTO EXTENEDED 5 16 18 BOLT AND SECURE WITH LARGE FLAT WASHER AND HEX NUT CAUTION TIGHTEN NUT ONLY TO HOLD...

Страница 25: ...IS A 3 4 THREADED PIPE FOR CONNECTION ELECTRICAL CONNECTION THERE ARE THREE PLUGGED HOLES ONE ON THE RIGHT HAND SIDE AND ONE ON THE LEFT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT FULL...

Страница 26: ...NOT ENERGIZED GAS REGULATOR NOT OPENING SPARK PLUG IS DEFECTIVE OR SPARK PLUG WIRE IS DEFECTIVE OR DISCONNECTED VENTS IN GAS REGULATOR IS PLUGGED UP C ENGINE RUNS ERRATIC AIR CLEANER IS DIRTY AND NEED...

Страница 27: ...START STOP HIGH TEMPERATURE DRY START STOP CONTACTS FROM OTHER EQUIPMENT NEUTRAL ENCLOSURE GROUND MECHANICAL GROUND LOAD SIDE 120 240 VAC AND NEUTRAL CONNECT TO TRANSFER SW GROUND STAKE FOR CONTROLLE...

Страница 28: ...LINES X YEARLY FUEL LINES X YEARLY CONNECTOR JOINTS X YEARLY EXHAUST MUFFLER X EVERY 6 MONTHS SPARK ARRESTOR X EVERY 6 MONTHS FLEX LINE X EVERY 6 MONTHS LEAKAGE X EVERY 6 MONTHS JOINT CLAMPS X EVERY 6...

Страница 29: ...g table to keep a record of all periodic and unscheduled maintenance and service See Ser vice Schedule Record the name address and phone number of your authorized GILLETTE service center DATE HOUR MET...

Страница 30: ...5 OWN 794 20080828 Gillette Generators Inc 1340Wade Drive Elkhart IN 46514 Phone 574 264 9639 Fax 574 262 1840 E mail sales gillettegenerators com www gillettegenerators com Call for Tech Support 1 86...