PAGE 28

 

SERVICE SCHEDULE

 

SYSTEM COMPONENT OR 

PROCEDURE

 

SEE 

PAGE

 

CHECK

 

CHANGE

 

CLEAN

 

TEST

 

FREQUENCY

 

ENGINE 

AIR CLEANER 

  

 X 

  

YEARLY OR EVERY 100 HRS. 

SPARK PLUG 

  

 X 

  

YEARLY OR EVERY 250 HRS. 

VIBRATION ISOLATORS 

  

 X 

  

  

  

YEARLY 

FUEL PIPING 

  

 X 

  

  

  

YEARLY 

GENERATOR 

EXERCISE (RUN) GEN-SET 

  

  

  

  

WEEKLY 

ROTOR AND STATOR* 

  

  

  

  

YEARLY 

VIBRATION ISOLATORS 

  

X  

  

  

  

YEARLY 

LUBRICATION 

OIL LEVEL 

  

  

  

  

MONTHLY 

CHANGE OIL ** 

  

  

  

  

EVERY 100 HRS 

REPLACE FILTER ** 

  

  

  

  

EVERY 150 HRS 

BATTERY 

TERMINAL CORROSION 

  

  

  

EVERY 6 MONTHS 

TIGHTEN TERMINALS 

  

  

  

  

EVERY 6 MONTHS 

VOLTAGE OUTPUT 

  

  

  

EVERY 6 MONTHS 

ELECTROLYTE LEVEL 

  

  

  

  

EVERY 6 MONTHS 

FUEL

 

FLEX LINES 

  

  

  

  

YEARLY 

FUEL LINES 

  

  

  

  

YEARLY 

CONNECTOR JOINTS 

  

  

  

  

YEARLY 

EXHAUST 

MUFFLER 

  

  

  

  

EVERY 6 MONTHS 

SPARK ARRESTOR 

  

 

  

  

EVERY 6 MONTHS 

FLEX LINE 

  

  

  

  

EVERY 6 MONTHS 

LEAKAGE 

  

  

  

  

EVERY 6 MONTHS 

JOINT CLAMPS 

  

  

  

  

EVERY 6 MONTHS 

COOLING 

AIR SCREENS 

  

  

  

YEARLY 

LOUVERS 

  

  

  

YEARLY 

CLEAN 

(SALT SPRAY AREAS) 

HOUSING EXTERIOR 

  

  

  

EVERY MONTH 

ENGINE LINKAGE 

  

  

  

EVERY MONTH 

GEN/ENG EXTERIOR 

  

  

  

EVERY MONTH 

COMPLETE ENG TUNE-UP 

*** 

BY AUTHORIZED REPAIR PERSONNEL  

YEARLY 

* Contact nearest repair station.   ** Recommended oil filter and air filter changed after first 20 hours operation.  
Change filters every 50 hours of operation for dusty, dirty environment, or constant high ambient temperatures.   

*** Complete engine inspection and maintenance items replaced by authorized repair service, on a regular 
scheduled maintenance program. 

Содержание SPH-120

Страница 1: ...OPERATION AND INSTALLATION GUIDE FOR MODELS SPS 100 SPH 120 SPS 120 SPV 160 GILLETTE GENERATORS AUTOMATIC POWER SYSTEMS...

Страница 2: ...tural Gas NG 12 13 Gaseous Dry Fuel System Liquid Propane Gas LPG 14 15 Prepare for Generator Operation 15 18 Access to Interior Battery Selection Installation Electricians Wiring Installation Final P...

Страница 3: ...procedure is used and is not recommended by GILLETTE the person or company responsible for the generator modification must assume all responsibility for safety and correct operation for the operator s...

Страница 4: ...AU TIONS Starting batteries are not furnished with your generator set but they are available through your installing contractor The home standby generator requires a Group 36 12 VDC fully charged batt...

Страница 5: ...running engine produces a poisonous gas from its muffler exhaust pipe This is an odorless in visible and colorless poison that cannot easily be detected Breathing carbon monoxide will cause fa tigue h...

Страница 6: ...ical output shows sparks smokes emits flames vibrates or shows any other abnormal operation Do not modify generator design Do not modify carburetion system as it is factory set for C A R B EPA emissio...

Страница 7: ...ibility of the sepa rate manufacturers of the ATS PRE INSTALLATION PLANNING The beginning installation requires some thought and planning The following illustrations are meant to fa miliarize reader w...

Страница 8: ...ther air intakes should be minimum 10 feet from exhaust end 6 Windows and doors on adjacent walls to be closed at all times during generator operation 7 Nearest roof overhang vent should be 10 feet fr...

Страница 9: ...best place for these two neutrals to meet generator and utility neutral is in the auto matic transfer switch However still connect gen set mechani cal ground to the stake All factory gen sets have a...

Страница 10: ...with the entire generator set 11 12 VDC battery charger Installer must connect 120 volt 1 phase utility power to this charger 12 Oil drain with flexible drain hose NOTE Change oil after every 50 hour...

Страница 11: ...to normal operation C Hour Meter Total hours of use and is used as service reminder D Main Line Circuit Breaker UL 146 circuit breaker will trip open upon short circuits or overloads KNOWYOUR SYSTEM C...

Страница 12: ...sure must be 6 to 8 inches water column 4 to 4 ounces and minimum 1000 BTU rating per cubic foot hour Figure 1 BTU Values based on 1000 BTU s per cubic foot Gas supplier may need to know Nat Gas consu...

Страница 13: ...l new installations plus any future repair or troubleshooting procedures must include a natural gas manometer test This test should be conducted after all other natural gas appliances have been turned...

Страница 14: ...135 cu ft can be de livered over a 50 ft distance with a 1 diameter fuel pipe INSTALLER S RESPONSIBILITY Use Figure 4 chart to learn cubic feet hour value of generator to be installed Use Figure 5 cha...

Страница 15: ...LPG tank are reasonably close 20 Ft to 50 Ft as it results in short runs for both electric wires and LPG fuel lines When these two identities are far apart always choose to locate generator as close t...

Страница 16: ...jobsite A fully charged battery must test at 12 5 13 0 volts DC Also the correct battery for models SPH 85 SPH 100 SPH 120 and SPV 160 must have lug terminals to match lug battery cables for a bolt to...

Страница 17: ...tery charger before working on battery terminals A battery can cause a chemical burn Before working on a battery follow safe procedures Wear full eye protection and protective clothing When battery el...

Страница 18: ...unction The generator will not ex ercise in this position TEST position will start the engine but will not dis connect utility power from the transfer switch This position is used for testing the gene...

Страница 19: ...re position this LPG venture For natural gas operation remove the carburetor flexible fuel line from LP stamped brass fitting and dead end brass cap from NG stamped brass fitting Attach fuel line to...

Страница 20: ...r switch ATS STEP 2 Turn the MODE SELECTOR switch located on the control panel from OFF RESET position to TEST position This will establish the first engine start cycle With the ENGINE RUNNING lamp lo...

Страница 21: ...rong enough to perform under this demanding scenario However if the load is 75 or more induc tive large motors UPS systems large air condition ers it may be necessary to install a time delay de vice a...

Страница 22: ...or Inspect the debris guard on engine air intake to insure no obstructions have accumulated Inspect radiator liquid cooled sets to insure no debris accumulation has occurred Some generator models have...

Страница 23: ...L CONNECTION THERE ARE TWO KNOCK OUT HOLES ON THE RIGHT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT GENERATOR END VIEW CONTROL DOOR PANEL THIS PANEL IS HERE TO HELP WITH INITIAL WIRING I...

Страница 24: ...POLY BASE AS SHOWN USING 5 16 18 HEX NUT TO LOCK BOLT IN PLACE INSTALL GEN SET AND METAL BASE ONTO EXTENEDED 5 16 18 BOLT AND SECURE WITH LARGE FLAT WASHER AND HEX NUT CAUTION TIGHTEN NUT ONLY TO HOLD...

Страница 25: ...IS A 3 4 THREADED PIPE FOR CONNECTION ELECTRICAL CONNECTION THERE ARE THREE PLUGGED HOLES ONE ON THE RIGHT HAND SIDE AND ONE ON THE LEFT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT FULL...

Страница 26: ...NOT ENERGIZED GAS REGULATOR NOT OPENING SPARK PLUG IS DEFECTIVE OR SPARK PLUG WIRE IS DEFECTIVE OR DISCONNECTED VENTS IN GAS REGULATOR IS PLUGGED UP C ENGINE RUNS ERRATIC AIR CLEANER IS DIRTY AND NEED...

Страница 27: ...START STOP HIGH TEMPERATURE DRY START STOP CONTACTS FROM OTHER EQUIPMENT NEUTRAL ENCLOSURE GROUND MECHANICAL GROUND LOAD SIDE 120 240 VAC AND NEUTRAL CONNECT TO TRANSFER SW GROUND STAKE FOR CONTROLLE...

Страница 28: ...LINES X YEARLY FUEL LINES X YEARLY CONNECTOR JOINTS X YEARLY EXHAUST MUFFLER X EVERY 6 MONTHS SPARK ARRESTOR X EVERY 6 MONTHS FLEX LINE X EVERY 6 MONTHS LEAKAGE X EVERY 6 MONTHS JOINT CLAMPS X EVERY 6...

Страница 29: ...g table to keep a record of all periodic and unscheduled maintenance and service See Ser vice Schedule Record the name address and phone number of your authorized GILLETTE service center DATE HOUR MET...

Страница 30: ...5 OWN 794 20080828 Gillette Generators Inc 1340Wade Drive Elkhart IN 46514 Phone 574 264 9639 Fax 574 262 1840 E mail sales gillettegenerators com www gillettegenerators com Call for Tech Support 1 86...

Отзывы: