
GBF-2-GVH Ventless Fryer
Pre-Operation Tests
35
Begin these test procedures with Unit set-up as follows:
• Power Switches for Fryers
①
and Hood
③
set to the
[OFF]
position.
• Heat Switches
②
for Fryers set in the
[OFF]
position.
• Filter Pan removed from Unit.
• Baskets and Crumb/Support Screens removed from vats.
• Fryer Drain Valves
④
set in the
[CLOSE]
position.
• Pump Diverter Valve
⑤
placed in the
[OIL RETURN]
position.
• Oil Return Valves
⑥
placed in the
[FILL POT]
position.
1
2
Fryers
Hood
3
4. Pre-Operation Procedure
Giles
takes pride in the quality of our workmanship. Every effort has been made to ensure that a new unit is in perfect
operating condition when received; each unit must pass rigorous quality control testing prior to shipment. To further
ensure that the unit operates to expectations, it is recommended that, after installation is complete, a brief function
tests be performed prior to using it for the first time.
Before attempting to perform these tests, please refer to
Section 3
and become familiar with the various controls
and their function. After you have read and fully understand the information, precisely follow the steps as
describe below to avoid possible equipment damage or malfunction.
4.01
Unit Set-up for Tests
4
4
5
6
6
Содержание GBF-2-GVH Series
Страница 2: ......
Страница 4: ......
Страница 12: ...x ...
Страница 16: ...4 Introduction GBF 2 GVH Ventless Fryer ...
Страница 26: ...Installation 14 GBF 2 GVH Ventless Fryer ...
Страница 28: ...16 Overview 1 GBF 2 GVH Ventless Fryer 3 01 Baskets Auto Basket Lifts Optional 2 4 3 Hidden ...
Страница 36: ...24 Overview GBF 2 GVH Ventless Fryer 3 05 Hood Control Panel 3 5 2 4 1 6 7 8 9 10 ...
Страница 38: ...26 Overview GBF 2 GVH Ventless Fryer Not Shown 3 06 Hood Front Filter Chamber 3 5 2 4 1 6 7 ...
Страница 46: ...34 Overview GBF 2 GVH Ventless Fryer ...
Страница 52: ...40 GBF 2 GVH Ventless Fryer Pre Operation Tests ...
Страница 93: ...81 Operation GBF 2 GVH Ventless Fryer ...
Страница 103: ...91 ...
Страница 111: ...99 Troubleshooting GBF 2 GVH Ventless Fryer ...
Страница 112: ...100 Troubleshooting GBF 2 GVH Ventless Fryer ...
Страница 116: ...104 Parts List GBF 2 GVH Ventless Fryer 8 03 Control Box Front each Fryer Unit 7 2 1 8 3 4 5 6 ...
Страница 120: ...108 Parts List GBF 2 GVH Ventless Fryer Not seen Backside of Panel 8 05 Lower Cabinet Left Side Fryer 7 2 1 8 3 4 5 6 1 ...
Страница 128: ...116 Parts List GBF 2 GVH Ventless Fryer 3 1 5 4 2 8 9 7 10 6 A 8 09 Filter Pan ...
Страница 132: ...120 Parts List GBF 2 GVH Ventless Fryer 8 11 Hood Front Door Control Panel 1 5 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 134: ...122 Parts List GBF 2 GVH Ventless Fryer 8 12 Hood Filter Fan Compartment 1 2 3 4 5 6 7 8 ...
Страница 136: ...124 Parts List GBF 2 GVH Ventless Fryer 2 1 3 4 8 13 Under Hood Components ...
Страница 138: ...126 Parts List GBF 2 GVH Ventless Fryer ...
Страница 139: ......