Table A - for 100 mm column and 50 mm leaf thickness
Preliminary checks:
For proper functioning of the automated device, the existing or new gate structure must meet the following
requirements:
- The individual leafs must have a maximum length of 3,5 metres
- The leaf structure must be robust and rigid
- The leafs must move smoothly and uniformly without irregular friction along their entire travel
- The existing hinges must be in a good condition
- The mechanical end-stops
A-B(1a)
must be fitted
Installing the operators
1 - Find the most suitable point where to fasten the front bracket of the operator
(4)
and mark it.
2 - Using a spirit level mark the point on the pillar where to fasten the rear bracket
(4)
.
3 - Identify the point where to fasten the rear bracket in relation to the dimensions
A-B
and
E
(5)
.
CAUTION:
Where there are big pillars or walls, a niche
(6)
must be made so that the dimensions A,B,and D are
respected.
Fastening the rear bracket:
-
If it is an iron pillar weld on the bracket check the column thickness and if it is less than 5 mm make a
reinforcement plate of such dimensions that the welds are made on the column rib
(7)
.
-
If it
is
a
cement
pillar,
make
a
plate
of
5
mm
thick
with
4
holes.
Weld
the
bracket
in the centre of the
plate and secure everything with through screws.
4 - Power the operator, move the lead nut forward to
about
5-10 mm
from
the
mechanical
end-stop.
WARNING:
when you feed the operator not installed on the gate, do not force the nut screw on the mechanical
limit switches to avoid damages to the operator. Stop the operator movement some millimetres
before the contact with the mechanical limit switch.
5 - Fasten the front bracket on the operator
(9)
.
6 - Move the leaf to closed position against the mechanical end-stops and secure it with a clamp.
7 - Fit the operator on the rear bracket using the pin provided
(10)
.
8 - Rest the front bracket on the point marked in step 1 above, then use a spirit level to check that the operator is
perfectly level, and mark the exact fastening point for the front bracket
(4 - 5)
.
9 - Remove the operator from the rear bracket.
10 - Remove the front bracket from the operator.
11 - Fasten the front bracket at the point marked.
Fastening the front bracket:
- If it is an iron gate weld on the bracket check the thickness of the pipe on which the bracket is to be welded and
if it is less than 5mm make a reinforcement plate of such dimensions that the welds
are made on the pipe rib
(11).
OPERATOR INSTALLATION
β
90°
90°
100°
110°
A
140
150
140
120
B
125
150
140
140
C
725
731
730
730
D
100
100
90
90
E
60
60
60
60
Cu
265
300
302
300
UK
18
BL240
Содержание BL240
Страница 3: ...9 3 BL240 3 2 E 60 Cu C A d1 D 90 B 60 d1 per 90 a1 60 B 140 per 110 85 78 897 mm 109 mm 740 mm 151 mm...
Страница 4: ...BL240 4 8 9 6 7 100 120 B A 100 120 150 150 B A 4 5 E 60...
Страница 5: ...A B A B 10 11 BL240 5 15a 15b 14 13 12...
Страница 6: ...19b 19a BL240 6 15c 16 17 18 a b c...
Страница 7: ...BL240 7 20 21 3 4 5 6 4 3 6 5 3 4 7 2 1 5 1 2 7...