
START - END OF SEASON OPERATIONS
START OF SEASON CHECK$
Make sure the power cable and plug are undamaged and the
earth system is efficient.
Follow the installation instructions precisely.
END OF SEASON OPERATIONS
To empty the interna! circuit completely of water, remove the cap
(fig. 32).
Run off all water left into a basin. When all the water has been
drained, put the cap back in place.
Clean the filter and dry thoroughly before putting back.
TECHNICAL SPECIFICATIONS
Mains voltage
Maximum absorbed power in air conditioning
Refrigerant
Cooling capacity
LIMIT CONDITIONS
Temperature of room in air conditioning
SIZE OF APPLIANCE
Width 435 mm
Height 715 mm
Depth 350 mm
see rating label
15
18
º
C-35
º
C (64
º
F-95
º
F) (Cooling)
10
º
C-25
º
C (50
º
F-77
°
F) (Heating)
Содержание Giatsu GIA-PC-09P15
Страница 1: ......