background image

Germany

GEZE GmbH

Niederlassung Süd-West

Tel. +49 (0) 7152 203 594

E-Mail: [email protected]

GEZE GmbH

Niederlassung Süd-Ost

Tel. +49 (0) 7152 203 6440

E-Mail: [email protected]

GEZE GmbH

Niederlassung Ost

Tel. +49 (0) 7152 203 6840

E-Mail: [email protected]

GEZE GmbH

Niederlassung Mitte/Luxemburg

Tel. +49 (0) 7152 203 6888

E-Mail: [email protected]

GEZE GmbH

Niederlassung West

Tel. +49 (0) 7152 203 6770 

E-Mail: [email protected]

GEZE GmbH

Niederlassung Nord

Tel. +49 (0) 7152 203 6600

E-Mail: [email protected]

GEZE Service GmbH

Tel. +49 (0) 1802 923392

E-Mail: [email protected]

Austria

GEZE Austria

E-Mail: [email protected]

www.geze.at

Baltic States –

Lithuania / Latvia / Estonia

E-Mail: [email protected]

Benelux

GEZE Benelux B.V.

E-Mail: [email protected]

www.geze.be

www.geze.nl

Bulgaria

GEZE Bulgaria - Trade 

E-Mail: [email protected]

www.geze.bg

China

GEZE Industries (Tianjin) Co., Ltd.

E-Mail: [email protected]

www.geze.com.cn

GEZE Industries (Tianjin) Co., Ltd.

Branch Office Shanghai

E-Mail: [email protected]

www.geze.com.cn

GEZE Industries (Tianjin) Co., Ltd.

Branch Office Guangzhou

E-Mail: [email protected]

www.geze.com.cn

GEZE Industries (Tianjin) Co., Ltd.

Branch Office Beijing

E-Mail: [email protected]

www.geze.com.cn

France

GEZE France S.A.R.L.

E-Mail: [email protected]

www.geze.fr

Hungary

GEZE Hungary Kft.

E-Mail: [email protected]

www.geze.hu

Iberia

GEZE Iberia S.R.L.

E-Mail: [email protected]

www.geze.es

India

GEZE India Private Ltd.

E-Mail: [email protected]

www.geze.in

Italy

GEZE Italia S.r.l. Unipersonale

E-Mail: [email protected]

www.geze.it

GEZE Engineering Roma S.r.l

E-Mail: [email protected]

www.geze.it

Korea

GEZE Korea Ltd.

E-Mail: [email protected]

www.geze.com

Poland

GEZE Polska Sp.z o.o.

E-Mail: [email protected]

www.geze.pl

Romania

GEZE Romania S.R.L.

E-Mail: [email protected]

www.geze.ro

Russia

OOO GEZE RUS

E-Mail: [email protected]

www.geze.ru

Scandinavia – Sweden

GEZE Scandinavia AB

E-Mail: [email protected]

www.geze.se

Scandinavia – Norway

GEZE Scandinavia AB avd. Norge

E-Mail: [email protected]

www.geze.no

Scandinavia – Denmark

GEZE Danmark

E-Mail: [email protected]

www.geze.dk

Singapore

GEZE (Asia Pacific) Pte, Ltd.

E-Mail: [email protected]

www.geze.com

South Africa

GEZE South Africa (Pty) Ltd.

E-Mail: [email protected]

www.geze.co.za

Switzerland

GEZE Schweiz AG

E-Mail: [email protected]

www.geze.ch

Turkey

GEZE Kapı ve Pencere Sistemleri

E-Mail: [email protected]

www.geze.com

Ukraine

LLC GEZE Ukraine

E-Mail: [email protected]

www.geze.ua

United Arab Emirates/GCC

GEZE Middle East

E-Mail: [email protected]

www.geze.ae

United Kingdom

GEZE UK Ltd.

E-Mail: [email protected]

www.geze.com

GEZE GmbH

Reinhold-Vöster-Straße 21–29

71229 Leonberg

Germany

Tel.: 0049 7152 203 0

Fax.: 0049 7152 203 310

www.geze.com

Содержание Slimdrive SL NT

Страница 1: ...Slimdrive SL NT Product family EN Pre installation instructions 192348 02...

Страница 2: ...8 5 2 Preparing the track 8 5 3 Mounting the stop buffers 8 5 4 Connecting the contact on the tooth belt lock optional 9 5 5 Mounting the module mount 9 5 6 Mounting cable guides 10 5 7 Connecting mo...

Страница 3: ...given order 1 2 Revisions and validity Version 02 valid for Slimdrive SL NT product family from model year 2021 1 3 Product liability In compliance with the liability of the manufacturer for his prod...

Страница 4: ...enance and repair work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety related tests If unauthorised chang...

Страница 5: ...rushing impact drawing in or shearing spots Danger of injury due to sharp edges on the drive and door leaf Danger of injury during installation through freely moving parts 2 4 Environmentally consciou...

Страница 6: ...cting profile roller carriage 70511 1 0107 Component drawing Module mount right DCU1 NT SL NT 70511 1 0108 Component drawing Module mount right SL NT FR 2M FR DUO 70511 1 0109 Component drawing Module...

Страница 7: ...ng 3 Transformer 4 Deflection pulley 5 Cover 6 Cable guide 7 Control unit 8 DCU cable guide 9 Rechargeable battery 10 Motor gear unit 11 Cover catch 12 Stop buffer 13 Track 14 Module mount right 15 Be...

Страница 8: ...4 1 X X Always drill the wall attachment drill holes in pairs one above the other in the drill grooves X X Clean the track and cover after machining 5 2 Preparing the track X X Mark position UPL for...

Страница 9: ...n the switching lug of the alarm contact switch 5 5 Mounting the module mount 5 5 1 Mounting the left hand module mount X X Mount the left hand module mount as shown in the drawing Module mount left w...

Страница 10: ...ule mount you are using can be found on the respective component drawing see Chapter 4 1 X X Slide the sliding blocks into the module mount X X Mount the components with the screws provided in accorda...

Страница 11: ...into the control unit 4 4 3 2 Slimdrive SL NT FR X X Route the rotary transducer cable 2 motor con nection cable 3 and motor connection cable of the second motor gear unit 1 to control unit X X Inser...

Страница 12: ...track 1 5 9 Connecting transformer and control unit X X Make sure that cables are shortened and laid in such a way that they do not become jammed when the cover is positioned and cannot come into con...

Страница 13: ...ide DCU 4 to the control unit X X Route the transformer cable 1 between the control unit 2 and module mount 5 Alternatively the transformer cable 1 can be fixed to the front of the control unit X X Fi...

Страница 14: ...le for tooth belt locking mecha nism 1 in at the control unit 2 1 2 X X Lay the cable for tooth belt locking mechanism 1 through the cable guide to the tooth belt locking mechanism optional 3 shorten...

Страница 15: ...ng Depending on the drive length install 1 or 2 earthing points see drive drawing next to the module mount on the left see figure and at the end of the track in addition with longer drives X X Screw t...

Страница 16: ...arry out device safety test in accordance with EN 60335 1 Appendix A The device safety test is made up of the following parts Protective earth test with 10 A test current Dielectric strength test high...

Страница 17: ...Disconnect the transformer cable at the lustre terminal of the transformer and secure it for transport 7 Preparation for installation During preparation for installation the drive unit is prepared for...

Страница 18: ...de the cover suspension piece 1 into the upper or lower screw duct of the cover 2 X X Secure the cover suspension piece 1 on the right and left at a distance of approx 50 mm from the end of the cover...

Страница 19: ...m 7 3 Installing the cover earthing X X At the left hand end of the cover 1 knock the locating pin for the cover earthing 2 flush into the groove on the cover 1 2 1 approx 30 mm 7 4 Installing the sid...

Страница 20: ...geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india...

Отзывы: