Slimdrive SL NT product family
8
Pre-mounting
5
Pre-mounting
The up-to-date drive drawing is applicable for the pre-mounting work to be carried out. All components must be
identified and installed in accordance with the drive drawing.
5.1 Machining the track and cover
X
Check profiles for damage.
X
Cut the track and cover to the required length (see machining drawings, Chapter 4.1).
X
Check whether additional fastening bore holes are necessary (see machining drawings (for bespoke track)
Chapter 4.1).
X
Always drill the wall attachment drill holes in pairs one above the other in the drill grooves.
X
Clean the track and cover after machining.
5.2 Preparing the track
X
Mark position (UPL) for stop buffer left (2) and (UPR) for stop buffer right (4) as shown on the drive drawing.
X
Mark position (Ux) for module mount left (1) and (Uy) for module mount right (3) as shown on the drive drawing.
5.3 Mounting the stop buffers
X
Place the stop buffers, left and right (1) on the track and swivel them upwards.
X
Screw in the setscrews M6×6 (2) until they are in contact with the track.
Do
not
tighten the setscrews.
The exact position of the stop buffers (1) is specified during installation of the moving leaf.