background image

DMJOIC201EN - v2 

VISIO C2H OPERATOR - 

INSTALLATION MANUAL 

Installation manual 

Op. Visio C2H 

Содержание Visio C2H

Страница 1: ...DMJOIC201EN v2 VISIO C2H OPERATOR INSTALLATION MANUAL 1 Installation manual Op Visio C2H ...

Страница 2: ...LLATION MANUAL VISIO C2H OPERATOR TRANSLATED DOCUMENT Read thoroughly all of these instructions before using the unit This manual includes all the necessary information required to install the product Keep this manual in a safe place for future reference 0 INDEX ...

Страница 3: ...DMJOIC201EN v2 VISIO C2H OPERATOR INSTALLATION MANUAL 3 ...

Страница 4: ...HT PL DOOR CLEAR WIDTH AT OVERALL OPERATOR WIDTH HM SLIDING LEAF HEIGHT HM HL HF FIXED LEAF HEIGHT HF HL AM SLIDING LEAF WIDTH AM PL 2 Sp AF FIXED LEAF WIDTH AF AH PL 2 HV BEAM HEIGHT HV HL 28 HT OVERALL DOOR HEIGHT HT HL 125 HR MINIMUM CEILING HEIGHT HR HT 5 min Dt TOTAL DOOR DEDUCTION Dt Dop S1 S2dch S2izq S2izq MINIMUM SAFETY DISTANCE HEAD AND BODY AS PER DET 2 4 1 S2dch MINIMUM SAFETY DISTANCE...

Страница 5: ...f width AF AH PL 2 Fixed leaf width 1 3 1 4 1 1 4 2 1 4 S2right S2left 1 4 1 i S1 Safety distances depending on Frame i S2 Safety distance depends on S as follows For D20 T20 F20 R20 T35 D35 S1 0mm For E20 S1 50mm For I30 S1 55mm For C44 S1 105mm For S44 S1 105mm If S 250 S2 200 mm If S 250 S2 500 mm DET Fig DET DET Fig Fig Fig 1 3 DOOR DIMENSIONS 1 2 1 3 1 Door width ...

Страница 6: ... height HR HT 5min Minimum ceiling height HV HL 28 Beam height 1 5 1 6 1 6 1 i Check the floor level beam and walls overhang FIG 1 7 Check AH for the whole opening as per Fig 2 Check that minimum HV HL 28 for the whole opening 1 7 1 8 1 9 5 min Fig Fig Fig Fig Fig Fig 1 4 CHECKS DET Fig Fig Fig Fig DET 1 8 1 9 1 3 2 Door height ...

Страница 7: ...e Fig 2 5 i 1 Track profile Length AT 20mm 2 Insulation profile Length AT 20mm Fig 2 4 Fig 2 5 Fig 2 4 2 2 2 Position 2 2 1 Introduce 2 2 TARCK PROFILE ASSEMBLY i Drill hole size Ø9 along main profile as shown in diagrams Fig 2 2 Fig 2 1 Tools Drill bit no 9 Fig 2 3 Fig 2 2 Fig 2 1 Space drill holes 2 PREPARE MAIN PROFILE 2 1 DRILLING ...

Страница 8: ...shown in the diagram Adjust the top wheel as shown in diagram Introduce the trolley on the top stile as shown in diagram Slide the trolley along the whole length of the main profile as shown in the diagrams Use a hand to help position the track rail Fig 2 8 Fig 2 7 Fig 2 6 Fig 2 6 Fig 2 6 2 3 ADJUST TRACK PROFILE ...

Страница 9: ... thread top lintel to the UPN beam x10 self threading screws placed at equal intervals along the length of the beam as shown in the diagrams Fig 3 3 Fig 3 3 Fig 3 2 Fig 3 4 Fig 3 3 Fig 3 2 Fig 3 1 i Set out the sections as shown in the diagram Fig 3 1 3 1 PROFILES LAYOUT 3 MAIN PROFILE AND TOP LINTEL ASSEMBLY 3 2 TOP LINTEL ASSEMBLY 3 2 1 Mark and screw ...

Страница 10: ...ts bolts Nuts bolts DIN6923 M8 SO7380 M8 20 i Drill where marked along the length of the UPN at Ø8 as shown in the diagrams Fig 3 8 Fig 3 7 Herrramientas Drill Ø8 Fig 3 8 Fig 3 7 Fig 3 5 i Drill holes in the beam using the main profile as template as shown in the diagrams Fig 3 6 Fig 3 5 Fig 3 6 3 3 2 Drill 3 3 1 Introduce and mark 3 3 3 Screw 3 3 MAIN PROFILE ASSEMBLY ...

Страница 11: ...oodw I30 Woodw 44 i Drill sections A A as shown in the diagram See table for different frame dimensions Fig 4 3 Fig 4 3 Tools Drill bit no 8 5 5 i Cut the bottom lintel as shown in the diagram Fig 4 2 Fig 4 1 Fig 4 2 4 1 MOUNT LOWER LINTEL 4 BOTTOM LINTEL PREPARATION 4 1 1 Cut 4 1 2 Drill ...

Страница 12: ... Woodw E20 Woodw D35 Woodw I30 Woodw 40 Woodw 44 Nuts bolts DIN6923 M8 i Screw the bottom lintel to the fixed leaves as shown in the diagrams Leave 40mm in the PL part of the door leaves Check table for different frame dimensions Fig 4 4 Fig 4 4 4 1 3 Screw ...

Страница 13: ...l Woodw E20 Woodw D35 Woodw I30 Woodw 40 Woodw 44 DET 5 2 1 Fig 5 1 Fig 5 2 i Mark and drill the floor on the inside of the AT in accordance with dimensions Mark and drill with respect to the reference vertical according to frame dimensions Fig 5 2 DET 5 2 1 Fig 5 1 Tools Nuts bolts Nuts bolts Drill bit no 6 DIN912 6x20 Rawlplug S 6 5 1 MOUNT FIXED LEAVES 5 FIXED LEAVES BOTTOM LINTEL PL ASSEMBLY 5...

Страница 14: ...LLATION MANUAL 14 Fig 5 6 i Check door leaves PL are parallel throughout the clear height Fig 5 6 Fig 5 5 Fig 5 4 Fig 5 3 i Position the fi xed leaves as shown in the diagrams Fig 5 3 5 4 5 5 5 1 2 Position fixed leaves 5 1 3 Check for plumb ...

Страница 15: ...11 Fig 5 10 Nuts bolts D 7504N 4 2x16 Fig 5 9 Fig 5 11 Fig 5 10 Fig 5 9 Fig 5 8 Fig 5 7 Nuts bolts D 7504N 4 2x16 i Screw x3 fi xed leaves to top lintel Fig 5 8 Fig 5 7 i Screw x3 bottom lintel PL to top lintel 5 2 BOTTOM LINTEL PL ASSEMBLY 5 1 4 Screw 5 2 1 Screw ...

Страница 16: ...ps and screws nuts into main profile 6 3 Position stops at the two ends of the main profile 6 4 Screw to the nut inside the channel and tighten the screw over the track rail 6 5 6 6 DIN7380 6x10 DIN6798 M 6 DIN933 6x12 Fig Nuts bolts Nuts bolts Nuts bolts Fig Fig Fig Fig Fig Fig Fig Fig Fig Fig 6 1 6 2 6 5 6 1 LATERAL STOPS ASSEMBLY 6 LATERAL STOPS LOCK ASSEMBLY 6 1 1 Insert nuts into beam 6 1 2 L...

Страница 17: ...ON MANUAL 17 Nuts bolts Nuts bolts DIN7380 6x10 DIN6798 M 6 Fig 6 9 Fig 6 8 Fig 6 7 Fig 6 9 Fig 6 8 Fig 6 7 i Introduce lock and screws nuts into centre of main profile Position the lock at AT 2 Screw nuts inside channel 6 2 CENTRAL LOCK ASSEMBLY ...

Страница 18: ...g 7 4 Fig 7 4 Nuts bolts D6334 M6x18 Nuts bolts PFH M6x10 Fig 7 3 i See the distribution of trolleys as per the scheme shown in the diagram For ease of assembly number them 1 to 4 Fig 7 2 Fig 7 1 Fig 7 2 Fig 7 1 7 1 1 Distribute the trolleys in the operator 7 DRAGGING TROLLEYS ARMS ASSEMBLY 7 1 TROLLEYS ASSEMBLY 7 1 2 Separators on trolleys assembly ...

Страница 19: ... main profile as shown in the diagrams Adjust the top wheel in the 4 trolleys as shown in the diagrams Fig 7 9 DET 7 9 1 Fig 7 7 Fig 7 8 i Attach lock hooks to trolleys 2 3 as shown in the diagrams Fig 7 5 Fig 7 6 Fig 7 6 Tools Nuts bolts DIN7380 6x10 DIN6798 M 6 Fig 7 5 7 1 3 Lock hooks assembly 7 2 INTRODUCE TROLLEYS INTO MAIN PROFILE ...

Страница 20: ...Fig 7 11 Nuts bolts Nuts bolts DIN7380 6x10 DIN6798 M 6 Fig 7 11 DET 7 10 1 DET 7 10 2 DET 7 10 2 i Screw anchors to arms as shown in diagram Fig 7 10 DET 7 10 1 DET 7 10 2 Fig 7 10 Nuts bolts Nuts bolts DIN7380 6x8 DIN6798 M 6 DET 7 10 1 7 3 DRAGGING ARMS ASSEMBLY 7 3 1 Anchors and arms assembly 7 3 2 Arms on trolleys assembly ...

Страница 21: ...and arm to left hand trolley 2 as shown in the diagram 7 12 i See correct layout once the trolley and arm assembly is complete 7 13 7 13 Fig Fig Fig DIN7380 6x10 DIN6798 M 6 Nuts bolts Nuts bolts Fig 7 3 2 Arms on trolleys assembly continuation 7 4 FINAL LAYOUT OF TROLLEYS ARMS ...

Страница 22: ...L 8 1 Mark the fl oor using the metal guide as a template 8 2 Position the guide as shown in the diagram 8 3 Drill the fl oor in accordance with the marks 8 4 8 2 8 3 Fig Fig Fig Fig Fig Fig Fig depends on frame dimensions 8 1 FLOOR GUIDES ASSEMBLY 8 GUIDES AND SLIDING LEAVES ASSEMBLY 8 1 1 Mark and drill the floor ...

Страница 23: ... top of the sliding leaves DET 8 7 1 Fig 8 7 Nuts bolts DIN6923 M8 DET 8 7 1 DET 8 7 1 2x leaf i Insert rawlplugs intro the holes which have been drilled Assemble guide as shown in the diagrams Fig 8 6 Fig 8 5 Fig 8 6 Fig 8 5 8 1 2 Screw in the guides 8 2 SLIDING LEAVES ASSEMBLY 8 2 1 Insert the screws into the square section bars ...

Страница 24: ...rt the leaf on the guide as shown in the diagram Insert the screws so they hang from the trolleys as shown in the diagrams Position the trolley with respect to the leaves as shown in the diagrams Fig 8 11 Fig 8 10 Fig 8 9 Fig 8 8 Fig 8 10 Fig 8 9 Fig 8 8 8 2 2 Leaves hanger ...

Страница 25: ...s shown in the diagram To adjust height of moving leaves 1 Loosen screws as shown in the diagram 2 Screw adjustment nut as shown in the diagram 3 Tighten screws as shown in the diagram Fig 8 13 Fig 8 14 Fig 8 13 Fig 8 12 Fig 8 14 Fig 8 13 Frame spacing table D20 F20 R20 T20 E20 6 T35 D35 S40 6 I30 15 C44 S44 26 8 2 3 Adjust moving leaves ...

Страница 26: ... that the two motors are the same distance from the centre of AT 9 3 Fig Fig 9 4 9 5 i Screw the drive unit to the main profile as shown in the diagrams 9 4 9 5 DIN7380 6x14 Spring Nut M6 Fig Fig Nuts bolts Nuts bolts Fig Fig 9 1 DRIVE UNIT ASSEMBLY 9 1 1 Insert nuts in main profile 9 DRIVE UNIT BELT ANCHOR ASSEMBLY 9 1 2 Placement of drive unit 9 1 3 Screw in the drive unit ...

Страница 27: ...m Fig 9 7 i Find the white mark in the belt which indicates where to locate the anchors as shown in the diagrams Attach the top left arm and the bottom right arm to the belt as shown in the diagrams See assembly diagram for correct operation Fig 9 7 Fig 9 6 Fig 9 5 Fig 9 6 Fig 9 5 9 2 BELT ANCHOR ASSEMBLY ...

Страница 28: ...he same distance from the centre of AT Fig 9 9 Fig 9 9 i Unscrew the left hand motor from the drive unit and screw it onto the extension plate as shown in the diagram Fig 9 8 Fig 9 8 PL C11 Length of Belt 2001 PL 2250 742 3050 2251 PL 2500 867 3550 2501 PL 2750 992 4050 2751 PL 3000 1117 4550 9a 1 1 Drive unit pre assembly 9a 1 DRIVE UNIT EXTENSION ASSEMBLY 9a ANEXO DRIVE UNIT EXTENSION ASSEMBLY P...

Страница 29: ... Fig 9 13 Fig 9 12 i Cut the belt as shown in the diagram See table for belt length Place the anchors along the belt as shown in the diagram For C11 length see table Attach anchors to arms as shown in diagram Fig 9 16 Fig 9 15 Fig 9 15 Fig 9 13 PL C11 Length of Belt 2001 PL 2250 742 3050 2251 PL 2500 867 3550 2501 PL 2750 992 4050 2751 PL 3000 1117 4550 9a 2 BELT ASSEMBLY ...

Страница 30: ... the posi tions shown in the diagrams Fig 10 5 Fig 10 4 Fig 10 5 Nuts bolts Spring Nut M6 Fig 10 4 Fig 10 3 i Assemble bottom and front cover as shown in diagrams Fig 10 2 Fig 10 1 Fig 10 2 Fig 10 1 10 1 BOTTOM AND FRONT COVER PRE ASSEMBLY 10 COVER ASSEMBLY 10 2 1 Insert nuts 10 2 BRACKETS ...

Страница 31: ...ig 10 9 Fig 10 8 Fig 10 9 Fig 10 8 i Mount brackets x4 onto the main profile as shown in the diagrams Fig 10 7 Fig 10 6 Nuts bolts Spring Nut M6 Nuts bolts DIN7380 6x14 Nuts bolts DIN6798 M 6 Fig 10 7 Fig 10 6 i Position top cover as shown in the diagram Fix x4 the brackets as shown in the diagram 10 3 2 Assemble snap on clip 10 3 1 Top cover assembly 10 2 2 Brackets assembly 10 3 COVERS ASSEMBLY ...

Страница 32: ...NUAL 32 Fig 10 14 Fig 10 13 Fig 10 12 i Assemble bottom cover onto brackets as shown in the diagram Fix bottom cover as shown in the diagram Close front cover as shown in the diagram Fig 10 14 Fig 10 13 Fig 10 12 10 3 3 Bottom and front cover assembly ...

Страница 33: ...INSTALLATION MANUAL 33 Nuts bolts CE PLUS 4 2X13 i Screw end covers to both ends of the cover as shown in the diagrams DET 10 15 1 DET 10 15 2 Fig 10 15 DET 10 15 2 DET 10 15 1 DET 10 15 2 DET 10 15 1 Fig 10 15 10 3 4 Side caps assembly ...

Страница 34: ... as shown in the diagram Make the hole in the centre of the bottom cover AT 2 as shown in the diagram Fig 11 5 Fig 11 4 11 2 DRILL THE BOTTOM COVER Fig 11 3 i Open front cover Release the bracket attachments for the bottom cover Remove the bottom cover and the front cover Fig 11 3 Fig 11 2 Fig 11 1 Fig 11 2 Fig 11 1 11 1 REMOVE FRONT AND BOTTOM COVER 11 MANUAL UNLOCK ASSEMBLY ...

Страница 35: ... Fig 11 7 Fig 11 8 Fig 11 7 i Screw the piece to the lock as shown in the diagram Ensure that the actuator is between the two projections as shown in the diagrams DET 11 7 1 Fig 11 7 Fig 11 6 DET 11 7 1 Nuts bolts Nuts bolts DIN7380 6x10 DIN6798 M 6 DET 11 7 1 Fig 11 7 Fig 11 6 Fig 11 3 1 Lock attachment piece assembly 11 3 MANUAL UNLOCK ASEMBLY 11 3 2 Bottom and front cover assembly ...

Страница 36: ...T 11 11 2 Fig 11 11 1 Fig 11 11 DET 11 11 2 Fig 11 11 1 Fig 11 11 Fig 11 10 i Insert the rack set onto the bottom cover as shown in the diagrams Ensure that the bolt rests in the slot and is centred with respect to the hole in the bottom cover as shown in the diagram DET 11 9 1 Fig 11 10 Fig 11 9 DET 11 9 1 DET 11 9 1 Fig 11 9 11 3 3 Rack set assembly 11 3 4 Unlocking actuator assembly ...

Страница 37: ...k s bolts open and close as shown in the diagram See the operation of the unlocking mecha nism as shown in the sequence Fig 11 16 Fig 11 15 Fig 11 15 i Insert the toothed cylinder as shown in the diagrams Push it in all the way until it snaps into place Fig 11 14 Fig 11 13 Fig 11 14 Fig 11 13 11 3 5 Toothed cylinder assembly 11 3 6 Operate lock manually ...

Страница 38: ...side key switch Side screen sensor Emergency push button Photocells Manusa Planar Radar Manusa infrared sensor White Auxiliary exit of 12V Receiver green Emitter yellow Grey Yellow White Black White Black White Black White Black White Black White Black Grey Grey Yellow White Grey 12 1 MAIN WIRING DIAGRAM 12 WIRING ...

Страница 39: ...3 4 5 6 7 8 9 10 1 2 3 3 4 4 5 6 7 8 9 10 Single phase 220V 240V 6 A Using the Optima selector 1 Check that leaves are in closed position before running the self adjustment procedure 2 Navigate to the technical service functions and select parameter F8 see the Optima selector manual 3 The self adjustment process will end after the door opens two consecutive times and monitors the performance of th...

Страница 40: ... button 4 repeatedly while keeping button 2 pressed to access the technical service functions 3 Press button 2 or 4 repeatedly until option SELF ADJUSTMENT is shown on the display Then confirm your option press ing button 3 4 Message RUN SELF ADJUSTMENT will appear on the display Press 3 to confirm 5 The self adjustment process will end after the door opens two consecutive times and monitors the p...

Отзывы: