background image

Rod locking

10

Assembly of RC2 variants of the Slimdrive SL product family

5.2.2  Adjusting the door leaves

 

X

Observe the applicable standards and guidelines on crushing, shearing and drawing-in spots.

 

X

Align door leaves flush with each other. Ensure the same level and parallel closing edges when doing so.

 

X

Set the height and parallel position of the door leaves at the hex of the suspension bolt (16).

 

X

Tighten the lock nut (17).

 

 

X

When the position of the door leaves is correct, tighten the hexagon socket-head screws (13) 

slightly

 and 

secure with lock nuts (12).

 

Содержание Slimdrive SC

Страница 1: ...Rod locking for the product families Slimdrive SL Slimdrive SLT Slimdrive SC EN Additional installation instructions 136395 03 ...

Страница 2: ...onditions 7 5 2 Fitting the door leaf 7 5 3 Adjusting the locking device 11 5 4 Setting up the bottom plate 11 5 5 Mounting the bottom plate 12 5 6 Installing and adjusting reinforcement brackets 12 5 7 Installing stop buffers 14 6 Assembly of RC2 variants of the Slimdrive SC product family 15 6 1 Pre conditions 15 6 2 Determining the position of the vertical rods at the floor guide 15 6 3 Making ...

Страница 3: ...ent property damage to understand or optimise the operation sequences means additional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the given order 2 Intended use GEZE GmbH is referred to as GEZE below The respective intended use for the sliding door system applies Any other use is considered non intended and will lea...

Страница 4: ...red and move easily X X Make sure that the door leaves are not moved accidentally or by unauthorised persons 4 1 Pre conditions à à Drive is set up completely à à Cover is removed à à Door leaves are hung in the drive and aligned in all directions à à Hanger bolts are not fixed tight à à Door leaves are separated from the toothed belt à à Door leaves are in the open position à à Track is milled ou...

Страница 5: ... device The position of the dead bolt 1 can be changed by turning the manual unlocking 4 with an Allen key 6 mm see Emergency operation Chapter 11 X X Loosen the housing fasteners 5 and 6 of the locking device X X Slide the housing fasteners 5 and 6 on the right and left into the rebate of the track X X Slide the locking device from the front into the rebate of the track and screw onto the housing...

Страница 6: ...tred into the T groove of the dead bolt 1 distance between upper edge of door rail and lower edge of housing profile 4 5 mm It must be possible to close the door leaf without noise If a noise can be heard when the vertical rod moves into the dead bolt the vertical rod has to be adjusted see Chapter 7 X X Fasten the locking device with the fixing screws 7 of the housing fasteners to the track 7 Nm ...

Страница 7: ...itions à à Drive is set up completely à à Cover is removed à à Locking device 2 is in the unlocked position dead bolt 1 is retracted into the housing 5 2 Fitting the door leaf 5 2 1 Fitting the door leaves WARNING Risk of injury due to glass breakage X X Always mount the door leaf together with another person The base structures 11 are available as an option support bracket base plate See the inst...

Страница 8: ...bolt 16 X X Slide the move lock 14 onto the door suspension 15 X X Slide the suspension bolt 16 through the move lock 14 X X Screw the lock nut 17 onto the hanger bolt 16 X X Mount the door suspensions 15 with mounted move locks 14 onto the roller carriage CAUTION Possible damage to the door leaf when hanging in X X Ensure that the door leaves are not scratched when hanging them in X X Thread the ...

Страница 9: ...are still unsecured and move easily X X Make sure that the door leaves are not moved accidentally or by unauthorised persons X X Screw the door leaf 18 to the door suspension using 2 screws 19 each X X Slide the door leaf approx 50 mm over the open position X X Introduce the door leaf into the angled floor guide 20 ...

Страница 10: ...nd drawing in spots X X Align door leaves flush with each other Ensure the same level and parallel closing edges when doing so X X Set the height and parallel position of the door leaves at the hex of the suspension bolt 16 X X Tighten the lock nut 17 X X When the position of the door leaves is correct tighten the hexagon socket head screws 13 slightly and secure with lock nuts 12 ...

Страница 11: ...rews 22 X X Tighten the screws 21 only slightly 7 Nm 0 5 Nm and secure with screw locker medium strength 5 4 Setting up the bottom plate The rod locking should have the same play in the bottom plate in the direction of actuation and the cross direc tion of the door leaf X X Close the door leaf 18 and place the bottom plate 23 X X Lock the door leaf 18 and align the bottom plate 23 X X Check whethe...

Страница 12: ...ntersunk screws 25 7 Nm 0 5 Nm 5 6 Installing and adjusting reinforcement brackets 5 6 1 Mounting the reinforcement brackets CAUTION Risk of damage to the door leaves X X Mount the reinforcement brackets so that the insides of the door leaves 18 are not contacted in the screwed on state X X Mount the reinforcement bracket 28 so that the insides of the reinforcement bracket lie flush with the main ...

Страница 13: ... 3 threaded holes 29 for the reinforcement bracket 28 at the left and right hand side secondary closing edge in the substructure optional X X Screw the reinforcement bracket 28 to the substructure optional using 3 countersunk screws 27 7 Nm 0 5 Nm 2 leaf 1 leaf left hand slide to open ...

Страница 14: ...ew 32 sufficiently so that the stop buffer 30 with the clamping plate 31 can be introduced into the track X X Push the stop buffer 30 on the track from the right and left X X Ensure that the rubber surfaces of the stop buffers point to the track middle X X Slide the stop buffers against the outer roller carriages of the door leaves X X Tighten the screw 32 10 Nm 0 5 Nm ...

Страница 15: ...ach other à à In the closed position the leaf main closing edges are oriented perpendicular to the floor sickle plate and to the locking device à à Locking device is in the unlocked position dead bolt is retracted into the housing 6 2 Determining the position of the vertical rods at the floor guide X X Mark the anticipated entry section of the vertical rods at the floor sickle plate 1 e g with tap...

Страница 16: ...e the door leaves to the open position X X Check the impressions 5 on the tape 2 If necessary apply the marking for the drill entry X X Drill through the floor sickle plate 1 at the impressions with a 11 mm drill bit The locking bolts have to be flush with the drill holes in the floor sickle plate X X Remove the tape 2 X X Chamfer the drill holes X X Check whether the locking bolts 6 travel into t...

Страница 17: ...et 3 mm X X Move one door leaf carefully to the closed position While doing so introduce the head 36 of the locking bolt at the top into the T groove of the dead bolt and fixate it in this position with the setscrew X X Adjust the height of the bottom part of the locking bolt 10 so that it has approx 10 mm space to the manual locking device or to the continuous floor guide in the unlocked state Th...

Страница 18: ...be triggered by soiling in the manual locking device The manual locking device must therefore be cleaned regularly X X Close the door leaves X X Loosen the setscrews of the two operating cams 39 and 40 on the extended motor axis of the locking device Adjusting the locked position X X Use the manual unlocking 4 to extend the dead bolt completely out of the dead bolt housing The rods engage into the...

Страница 19: ...anism X X Check function X X Realign the locking mechanism and door leaf Manual locking device X X Check for jarring free function X X Clean the manual locking device and if necessary grease it X X Check the function of the compression springs for Mat No 104562 X X Remove the manual locking device replace the spring if necessary replace the complete manual locking device Manual unlocking X X Check...

Страница 20: ... geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india geze com www geze in Italy GEZE Italia S r l Unipersonale E Mail italia it geze com www geze it GEZE Engineering Roma S r l E Mail italia it geze com www geze it Korea GEZE Korea Ltd E Mail info kr ge...

Отзывы: