![GESTRA ZK 213 Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/gestra/zk-213/zk-213_original-installation-instructions_2217873048.webp)
48
Put the retaining ring (52) into the insert.
Put the support ring (53) into the insert.
Insert the small segment (54) into the support
ring (53).
Attention!
Malfunctions may occur if the packing
rings are damaged.
Before installation discard and replace
any damaged packing rings.
Make sure that the packing rings are
correctly positioned and not damaged
or skewed when fitted.
Put the ring (49) into the bore.
Put the packing rings (48) into the bore.
Put the balance ring (47) into the bore.
Put the stuffing box screw (46) into the bore.
Put the bolt (39) into the bore.
Repeat these steps for the other stuffing boxes
of the pressure balance device.
To mount the stuffing box packing do not tighten
the bolts any more.
Tighten the screws of the stuffing boxes only
until their heads are below the stuffing box
flange.
Содержание ZK 213
Страница 1: ...Control valve ZK 213 Original Installation Instructions 818449 03 ...
Страница 63: ...63 ...