20
Operation, alarm and test
Setting group temperatures in mode 1 and 6
Function
To detect banking-up of condensate the temperature of the condensate in the steam trap is compared
with the condensate temperature in the plant. The temperature sensor TRG 5-.. (Pt 100) measures the
temperature of the plant.
It is possible to divide the plant in groups.Each group requires the measurement of the group tempera-
ture and at least one detection of condensate banking-up. The plant can be split up into a maximum of
eight groups.
To measure the group temperature connect a temperature sensor Pt 1000 instead of the measuring
electrode NRG 16-27, NRG 16-28. Connect the temperature sensor to the connecting terminals 1, 2 and
3.
Fig 4
5
-
=
Connecting terminals of measuring electrodes
Examples of three groups:
Channel
GrP ON / OFF Group
Remark
T-Sys
1
Pt 100, plant temperature first group
C.01
OFF
1
C.02
OFF
1
C.03
ON
2
Pt 1000, plant temperature second group
C.04
OFF
2
C.05
ON
3
Pt 1000, plant temperature third group
C.06 - C.16
OFF
3
The prerequisites for operating mode 1 and 6 with measurement of group temperature are:
the use of the measuring electrodes NRG 16-27, NRG 16-28 (with integrated condensate tempera-
ture measurement at the steam trap).
the use of a separate temperature sensor for the measurement of the system/(plant) temperature.
the use of temperature sensors Pt 1000, the number of which depends on the planned groups
- continued -
Содержание NRA 1-3
Страница 29: ...29 For your Notes ...
Страница 30: ...30 For your Notes ...
Страница 31: ...31 For your Notes ...