11
Examples of installation
LRG 16-4
Key
4
Joint ring 17 x 21,
form D, DIN 7603, 1.4301, bright annealed
5
T-piece connector
6
Shut-off valve GAV
7
Continuous blowdown valve BAE
8
Boiler drum
9
Level pot 3 MF 88.0
0
Level pot 4 DB 372
Fig. 7
Conductivity monitoring and continuous boiler blowdown, installation of conductivity electrode in top
blowdown line via separate level pot
0
LRG 16-4
- continued -
- continued -