10
M
NW
LW
NB
R*
Examples of installation
LRG 16-4
Conductivity monitoring and continuous boiler blowdown, direct installation of conductivity
electrode via T-type connector and connection of a continuous blowdown valve
Fig. 5
LRG 16-4
8
6
7
G
3
/
8
A, ISO 228
4
R*: 40 mm
A
~ 250
170
8
5
M
Fig. 6
9
6
Conductivity monitoring, direct installation of conductivity electrode via flanged standpipe on the side of
the boiler or installation of electrode in an external level pot
≥ 40
≥ 100
≥ 40
≥ 40
7
LW
8
LRG 16-4