13
PRE-INSTALLATION INFORMATION - PRÉALABLES - PRELIMINARES
Beforetheinstallationtoscrewthesupplyflexibletubestothecontrolsandinstallthepop-upwasterod
on the body of the spout.
Avantdel’installationvisserlestubesflexibled’alimentationauxcommandeset
i
nstaller la tige de
contrôle de l’écoulement.
Antesdelainstalaciònatornillarlostubosflexiblesdealimentaciònalosmandosy
Instalen el asta de
controle de descarga.
Содержание MIMI 36511
Страница 5: ...5 PRE INSTALLATION INFORMATION PRÉALABLES PRELIMINARES Art 36511 ...
Страница 6: ...6 PRE INSTALLATION INFORMATION PRÉALABLES PRELIMINARES Art 36515 ...
Страница 12: ...12 PRE INSTALLATION INFORMATION PRÉALABLES PRELIMINARES Hot Chaude Caliente Cold Froide Fría OK NO ...
Страница 16: ...16 INSTALLATION INSTALLATION INSTALACIÓN Fig 5 Fig 6 Fig 7 Fig 9 Fig 8 1 7 16 37 mm ...
Страница 19: ...19 WORKING FONCTIONNEMENT FUNCIONAMIENTO Fig 11 OPEN OPEN HOT COLD Art 36511 OPEN OPEN HOT COLD Art 36515 ...
Страница 24: ...24 MAINTENANCE ENTRETIEN MANUTENCIÓN Fig 19 Fig 20 NO 18 1 Position Fig 21 CLOSE Fig 22 Fig 23 1 8 2 5 mm ...
Страница 26: ...26 MAINTENANCE ENTRETIEN MANUTENCIÓN Fig 26 Fig 27 NO 18 1 Position Fig 28 CLOSE Fig 29 Fig 30 1 8 2 5 mm ...
Страница 31: ......
Страница 32: ...ET 41389 R1 ...