Page 9/41
© Geobrugg Gruppe, CH-8590 Romanshorn, Switzerland
GBE-100A / 06
2
TOOLS FOR INSTALLING ROCKFALL BARRIERS
STA
KI
N
G
-OU
T
WOR
K
•
30
– 50 m measuring tape
•
Folding meter stick
•
5 red and white ranging poles
•
Inclinometer
•
Spray can
•
Wooden peg or iron peg (min. 3x for each field)
•
Hammer/mallet
•
Manual
INSTA
L
L
A
T
IO
N WOR
K
•
Open-ended or ring wrench
•
Socket wrench set with ratchet
•
Torque wrench, range 25
– 400 Nm (see tightening torque required for wire rope clips and base
plate fastening nuts)
•
Open-ended wrench for base plate fastening nuts
•
Felco C16 or C112 wire rope cutter or similar; 12 mm cutting capacity
•
Motor cutting disc or hammer wire cutter; 28 mm cutting capacity
•
Pincers, flat-nose pliers
•
2 mm galvanized wire strands or wire
•
Angle spirit level
•
Roll of adhesive tape
•
Rope clamp, small 8
– 16 mm/large 14 – 26 mm (min. 2x)
•
At least 2 tension belts
•
Cable winch hoist, e.g. LUG-ALL
®
•
Chain hoist or HABEGGER wire rope hoist, min. 1.5 t (15 kN)
•
Auxiliary ropes
Содержание GBE-100A
Страница 2: ...Page 2 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 3: ...Page 3 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 39: ...Page 39 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 40: ...Page 40 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 41: ...Page 41 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...