Page 37/41
© Geobrugg Gruppe, CH-8590 Romanshorn, Switzerland
GBE-100A / 06
10
ADDITIONAL SOLUTION TO THE STANDARD
BRACE ELEMENT SOLUTION
If there is not sufficient space to stake out the lateral anchors using the standard procedure, a strut solu-
tion can be developed in consultation with Geobrugg AG.
ROCK FACE CONNENCTION
If it is not possible to use the standard staking-out procedure, an option for solid rock can be developed in
consultation with Geobrugg AG. This also involves installing towing nets at the edges of the structure.
GAP FILLING SOLUTION
On steep mountain slopes with mountain torrents, there may be larger gaps between the ground and the lower
support rope. Individual gap solutions can be developed in consultation with Geobrugg AG
Содержание GBE-100A
Страница 2: ...Page 2 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 3: ...Page 3 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 39: ...Page 39 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 40: ...Page 40 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...
Страница 41: ...Page 41 41 Geobrugg Gruppe CH 8590 Romanshorn Switzerland GBE 100A 06...