4/36
© Geobrugg AG, Switzerland
L2_ATT-80 en Product Manual 01_190101.doc
Content
Intended application/Purpose .............................................................................................................. 2
Target group ........................................................................................................................................ 2
Liability and limitation of liability .......................................................................................................... 2
Symbols used ...................................................................................................................................... 2
1
Important information ....................................................................................................................... 6
Qualification of the group leader .............................................................................................. 6
Tensioned ropes ...................................................................................................................... 6
2
General information .......................................................................................................................... 6
Key ........................................................................................................................................... 6
System drawings ...................................................................................................................... 6
View of the drawings ................................................................................................................ 6
3
Tools ................................................................................................................................................... 7
Staking-out ............................................................................................................................... 7
Installation ................................................................................................................................ 7
4
Using the wire rope clips .................................................................................................................. 8
Step 1 Lubricate threads .......................................................................................................... 8
Step 2: Install the wire rope clips ............................................................................................. 8
Step 3: Tighten the wire rope clips .......................................................................................... 9
5
Staking-out ....................................................................................................................................... 10
General principles for staking-out .......................................................................................... 10
Position of the barrier ............................................................................................................. 10
Ideal barrier line ..................................................................................................................... 10
Orientation of the foundations and base plates ..................................................................... 11
Post inclination ....................................................................................................................... 11
Staking-out for straight barrier line ......................................................................................... 12
Staking-out with an upslope change in direction ................................................................... 12
Staking-out with a change in direction towards the downslope ............................................. 13
Staking-out with support rope separation with intermediate suspension .............................. 14
Staking-out with support rope separation with intermediate suspension straight .................. 15
6
Base plate ........................................................................................................................................ 16
Inclination ............................................................................................................................... 16
Anchoring ............................................................................................................................... 16
Drilling .................................................................................................................................... 17
7
Installing the rope anchor .............................................................................................................. 18
Foundation example for the rope anchor ............................................................................... 18
8
Preparing the posts......................................................................................................................... 19
Содержание ATT-80
Страница 1: ...Date 01 01 2019 Edition 01 Geobrugg AG 8590 Romanshorn Product Manual ATT 80 ATTENUATOR SYSTEM...
Страница 3: ...3 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 23: ...23 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 25: ...25 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 2 Middle post...
Страница 26: ...26 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 3 Upslope anchor ropes...
Страница 27: ...27 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 4 Lateral anchoring...
Страница 32: ...32 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 34: ...34 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc 12 System drawings...
Страница 35: ...35 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...