20/36
© Geobrugg AG, Switzerland
L2_ATT-80 en Product Manual 01_190101.doc
9
Installation steps for the superstructure
Prior to the start of step 1, drill the anchor and prepare the foundations.
Extreme caution is advised as long as the posts have not been fixed. There is a risk of death, serious
injury and/or property damage.
Step 1: Install overturn securing ropes
Install the overturn securing ropes on the base plates.
Step 2: Erect the posts
Erect the posts using upslope anchor ropes and the overturn securing ropes.
Step 3: Fix lateral anchoring
Install the lateral anchor ropes (and if required, the intermediate anchor ropes).
Содержание ATT-80
Страница 1: ...Date 01 01 2019 Edition 01 Geobrugg AG 8590 Romanshorn Product Manual ATT 80 ATTENUATOR SYSTEM...
Страница 3: ...3 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 23: ...23 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 25: ...25 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 2 Middle post...
Страница 26: ...26 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 3 Upslope anchor ropes...
Страница 27: ...27 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 4 Lateral anchoring...
Страница 32: ...32 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 34: ...34 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc 12 System drawings...
Страница 35: ...35 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...