5/36
© Geobrugg AG, Switzerland
L2_ATT-80 en Product Manual 01_190101.doc
9
Installation steps for the superstructure ...................................................................................... 20
Step 1: Install overturn securing ropes .................................................................................. 20
Step 2: Erect the posts ........................................................................................................... 20
Step 3: Fix lateral anchoring .................................................................................................. 20
Step 4: Top support ropes ..................................................................................................... 21
Step 5: Attach the net ............................................................................................................ 21
Step 6: Edge ropes ................................................................................................................ 22
10
Assembly details ............................................................................................................................. 24
Detail 1: Border post (left) ...................................................................................................... 24
Detail 2: Middle post .............................................................................................................. 25
Detail 3: Upslope anchor ropes ............................................................................................. 26
Detail 4: Lateral anchoring ..................................................................................................... 27
Detail 5: Connecting net panels to top support rope ............................................................. 28
Detail 6: Connecting net panel to net panel horizontally ....................................................... 29
Detail 7: Net connection vertical with seam rope ................................................................... 30
Detail 8: Net connection vertical with shackles ...................................................................... 31
11
Final check ....................................................................................................................................... 33
12
System drawings ............................................................................................................................. 34
13
Key ................................................................................................................................................... 36
Содержание ATT-80
Страница 1: ...Date 01 01 2019 Edition 01 Geobrugg AG 8590 Romanshorn Product Manual ATT 80 ATTENUATOR SYSTEM...
Страница 3: ...3 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 23: ...23 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 25: ...25 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 2 Middle post...
Страница 26: ...26 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 3 Upslope anchor ropes...
Страница 27: ...27 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc Detail 4 Lateral anchoring...
Страница 32: ...32 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...
Страница 34: ...34 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc 12 System drawings...
Страница 35: ...35 36 Geobrugg AG Switzerland L2_ATT 80 en Product Manual 01_190101 doc...