Rackmount Configuration 

Use the included rackmount tray, brackets and screws to mount the Battery Module in a rack by 
following the steps below. 

1.

 

Install the tray into the rack using appropriate rack mounting screws. Note that these screws 
and caged nuts are not supplied. 

2.

 

Install the tray supporting rails and attach to the racks rear vertical mounting post using 
appropriate rack mounting screws. 

3.

 

Using the supplied screws, tighten the rail to the tray. 

4.

 

Slide the battery module into the tray. 

5.

 

Attach the battery module retaining plates using rack mount bolts (not supplied). Attach the 
battery module retaining plates to each side of the battery module. Use of split washers maybe 
required where the modules are retained in areas of movement or vibration. 

NOTE: Failure to install the tray supporting rails may result in failure of the battery module tray. 

6.9

 

Connecting the Battery Module 

 (QUALIFIED SERVICE PERSONNEL ONLY!) 

1.

 

Ensure that the battery module circuit breaker is in the OFF (lever down) position. 

2.

 

This should also be confirmed by seeing that the green LED is OFF. 

3.

 

Attach  an  earth  wire  (if  required  in  your  design)  to  the  earth  point,  located  just  below 
connector J1. An alternate earth point is also located on the rear of the module. 

4.

 

Inspect for any damage to cables or connectors. 

5.

 

Connect the Power In/Out J1 connector by firmly pushing the plug straight into the socket. 

 

 

Содержание GC48V-040LFP-2RU

Страница 1: ...Product Manual Lithium Ferro Phosphate LFP Battery Module 48V 2kWh and 3kWh 2RU Scalable Energy Solutions Model Numbers GC48V 040LFP 2RU and GC48V 060LFP 2RU Series III with or without rack tray kit...

Страница 2: ...LE 8 6 6 PARALLEL CONNECTION 8 6 7 SERIES CONNECTION 8 6 8 RACKMOUNT CONFIGURATION 9 6 9 CONNECTING THE BATTERY MODULE 9 7 OPERATION 10 7 1 TO TURN THE BATTERY MODULE ON AND OFF 10 7 2 POWER IN OUT J1...

Страница 3: ...o not recommend the use of any of our products in life support applications where failure or malfunction of the product can be reasonably expected to cause failure of the life support device or to sig...

Страница 4: ...f Electric Shock Hazardous voltages maybe present on parts inside this module Do not attempt to open or disassemble the module These Battery Modules contain no user serviceable parts Stored Energy The...

Страница 5: ...non condensing 85 IP Rating IP50 Battery Case Dimensions mm 450D x 420W x 88H 570D x 420W x 88H Battery Tray Dimensions mm 450D x 483W 570D x 483W Tray Slide Range mm 480 to 760 590 to 880 Terminal C...

Страница 6: ...tor is a standard Anderson SB50 Blue connector The upper pin is positive and the lower pin is negative 5 3 Earth Point Connects the chassis of the battery module to ground Another earth stud is locate...

Страница 7: ...ted to regularly exceed 55 C Extreme cold where the ambient temperature is expected to regularly fall below 10 C Direct sunlight Rain water salt laden air or where the humidity is likely to cause cond...

Страница 8: ...ditional considerations apply As the connection of these modules in parallel can result in high currents and stored energy the design of such a system should be made by a suitably qualified engineer A...

Страница 9: ...g plates using rack mount bolts not supplied Attach the battery module retaining plates to each side of the battery module Use of split washers maybe required where the modules are retained in areas o...

Страница 10: ...arging the Battery Module These battery modules should only be charged by an approved charger that is designed to charge LFP chemistry at the correct voltage current and charge profile The charging pr...

Страница 11: ...dules can both deliver up to 60Amps 1C if required 7 4 2 When to charge a discharged module While the battery module is protected by the BMS to prevent excessive battery module discharge it is recomme...

Страница 12: ...reaker configuration o Ventilation and or air conditioning where fitted to a room or rack is functioning correctly to maintain the proper temperature of the battery bank In particular the state of any...

Страница 13: ...ECK FOR CHARGING CIRCUIT SUPPLYING EXCESSIVE CHARGE VOLTAGE BMS OVER TEMPERATURE IN PROTECTION MODE OUTPUT OFF CHECK AND INVESTIGATE REASON FOR HIGH TEMPERATURE OTHER RETURN TO GENZ FOR SERVICE GREEN...

Страница 14: ...AN 60AMPS REFER TO INFORMATION WARNING REGARDING STATE OF CHARGE OTHER RETURN TO GENZ FOR SERVICE BATTERY MODULE FAILING TO CHARGE OR HOLD CHARGE INSUFFICENT CHARGE VOLTAGE CURRENT CHECK FOR FAULTY CH...

Страница 15: ...ll system o The overall system has been configured such that charging and discharging requirements as detailed in this manual are met o The person or persons installing these battery module s has prov...

Страница 16: ...lete The percentage of rated capacity can now be calculated as Percentage of rated capacity 0 5 x C x hours to discharge C 100 Where C Rated Capacity Amp Hours Example 48V 3kWh battery module has a ra...

Страница 17: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 17 of 25 10 Appendix A Discharge and Capacity Curves 25 C...

Страница 18: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 18 of 25 11 Appendix B Circuit Breaker Trip Curve BS...

Страница 19: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 19 of 25 12 Appendix C Dimensions 12 1 2kWh Module and Tray...

Страница 20: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 20 of 25...

Страница 21: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 21 of 25 12 2 3kWh Module and Tray...

Страница 22: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 22 of 25...

Страница 23: ...guidelines should be followed Operating Parameters for 10 Year Warranty Equivalent to 80 Retained Capacity 10 000 Cycles 5 000 Cycles 2 500 Cycles Discharge Charge Rate 0 5 C Depth of Discharge DoD 8...

Страница 24: ...LFP Battery Module Product Manual All rights reserved genZ 2020 Issued for Use Revision Page 4 03 2020 2 1 24 of 25 Notes Serial Number Model Number Place of Purchase Date of Purchase Owner...

Страница 25: ...genZ Energy Pty Ltd Western Australia Email info genz com au Web www genz com au...

Отзывы: