D.Starter dismantle
1.Dismantle left crankcase cover
2.Remove hexagon nut, then remove the starter lever.
3.Remove five screw of separated plate.
4.Remove start spring from
start returning position.
5.Remove driven gear comp. of
kick starter.
6.Remove the retaining C-type
Ring.
7.Remove spindle comp.
of kick starter.
8.Checking starter
a. Check the wearing condition of the outer diameter of spindle comp and the inner
diameter of bush and gear.
b. Check the wearing condition of shaft of driven gear comp. Gear sets and
ratchet.
9.Assembling the starter
Assemble the starter follows the.
Opposite procedure of dismantling.
Locking torque : M6: 1.0~1.2kg/m.
Note:
Make sure one end of the torsion spring is
hooked on the groove of driven gear, and
another end of torsion spring is hooked on
the pole of inside of left crankcase.
Put some grease in every shaft and gear sets
before assembly.
Содержание Blur 150
Страница 1: ......
Страница 2: ...Blur 150 220i Service Manual...
Страница 15: ...C Chassis appearance 1 Apply oil 1 2 2 Apply grease 3 4 5 6 7 8 1 2 3 4 5 6 7 8...
Страница 16: ...D Wheel bearing Final transmission mechanism gear oil Speedometer gear clean grease...
Страница 46: ...1 Lubrication System...
Страница 70: ...7 A C Generator A Dismantling AC generator B Installing AC generator...
Страница 84: ......
Страница 104: ...1 Brake pad inspection for BLUR 150...
Страница 116: ...3 Recharge system A Recharge system diagram for BLUR 150...
Страница 131: ...BLUR 220 engine dismantle crankshaft from the left crankcase don t damage the oil impact the crankshaft...
Страница 134: ...1 6 3 Electric system Carburetor model electric General maintenance Engine Management System...
Страница 140: ...7 Fuse wire white white Main fuse layout relay fuse layout reserved fuse layout Red white Red Red white Red black...
Страница 143: ...10 BLUR 220 Specified engine oil synthetic 1000ml...
Страница 157: ...1 Engine Management System Engine Management System Engine Management System Engine Management System EMS EMS EMS EMS...
Страница 158: ...2 EMS index EMS units EMS diagnostic...
Страница 159: ...3 Feature of PGO 2nd stage EMS feature 1 small light 2 integrity 3 accuracy 4 simple...
Страница 162: ...6 EMS units...
Страница 163: ...7 Throttle position sensor Intake pressure sensor injector Idle Speed Controller...
Страница 164: ...8 FUEL PUMP COMP COIL COMP IGNITION O2 SENSOR TE SENSOR crankshaft ANGLE SENSOR...
Страница 165: ...9 ECU ECU ECU ECU SAFETY SENSOR SIDE STAND AIAC ASSY SOLENOID...
Страница 166: ...10 Important PIN no of ECU no of ECU no of ECU no of ECU ECU PIN 1 PIN 18 PIN 19 PIN 36 PIN...
Страница 175: ...19...
Страница 176: ...46 Wiring diagram for BLUR 150 4V...
Страница 177: ...47 Wiring diagram for BLUR SS220I...
Страница 178: ...48...
Страница 179: ...49...