Section 3 • Scheduled Maintenance Procedures
REV B
November 2005
Part No. 84700
GR-12 • GR-15 • GR-20
3 - 25
6 Turn the key switch to ground control.
7 Test all machine functions from the ground
controls.
Result: All ground control functions should not
operate.
8 Lift the test weight off the platform floor using a
suitable lifting device. Turn the key switch to the
off position.
9 Turn the key switch to ground control.
Result: The diagnostic display at the ground
controls will show two flat bars and a blinking
light, indicating a normal condition, and the
diagnostic display at the platform controls will
show the battery condition.
Result: The diagnostic display will show 'OL' at
both the ground and platform controls. The
platform overload system is not operating
properly. See D-1, Calibrate the Platform
Overload System (if equipped).
10 Test all machine functions from the ground
controls.
Result: All ground control functions should
operate normally.
11 Turn the key switch to platform control.
12 Test all machine functions from the platform
controls.
Result: All platform control functions should
operate.
If the platform overload system is
not operating properly, see D-1,
Calibrate the Platform Overload
System (if equipped).
CHECKLIST
C
PROCEDURES
Содержание GR05-5001
Страница 4: ...November 2005 GR 12 GR 15 GR 20 Part No 84700 This page intentionally left blank iv...
Страница 90: ...Section 5 Fault Codes November 2005 5 4 GR 12 GR 15 GR 20 Part No 84700 This page intentionally left blank...
Страница 104: ...Part No 84700 Rev B Service Manual GR 12 GR 15 GR 20 from serial number GR05 5001...