Section 3 • Scheduled Maintenance Procedures
REV B
November 2005
Part No. 84700
GR-12 • GR-15 • GR-20
3 - 23
C-1
Grease the Platform Overload
Mechanism (if equipped)
Genie specifications require
that this procedure be performed
every 500 hours or 6 months,
whichever comes first. Perform
this procedure more often if dusty
conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
1 Locate the grease fittings on each pivot pin of
the platform overload assembly.
2 Thoroughly pump grease into each grease
fitting using a multi-purpose grease.
Checklist C Procedures
C-2
Replace the
Hydraulic Tank Breather Cap -
Models with Optional Hydraulic Oil
The hydraulic tank is a vented-type tank. The
breather cap has an internal air filter that can
become clogged or, over time, can deteriorate. If
the breather cap is faulty or improperly installed,
impurities can enter the hydraulic system which
may cause component damage. Extremely dirty
conditions may require that the cap be inspected
more often.
1 Remove and discard the hydraulic tank breather
cap.
2 Install and new cap onto the tank.
Содержание GR05-5001
Страница 4: ...November 2005 GR 12 GR 15 GR 20 Part No 84700 This page intentionally left blank iv...
Страница 90: ...Section 5 Fault Codes November 2005 5 4 GR 12 GR 15 GR 20 Part No 84700 This page intentionally left blank...
Страница 104: ...Part No 84700 Rev B Service Manual GR 12 GR 15 GR 20 from serial number GR05 5001...