Table of Contents

 

Safety Guidelines

 

Section 1 - Installation Instructions

 

1.1 Location

 

1.2 Changing the Oil

 

1.3 Electrical Connection

 

1.4 Prior Run Time

 

1.5 Filter

 

1.6 Dew Point Monitor

 

1.7 DAP Outlet

 

1.8 DAP Air Maintenance Device

 

1.9 Electronic Drain Valve

 

Section 2 - Start-Up Instructions 

Section 3 - Operation

 

3.1 - Description of Operation

 

3.2 - Setting Purge Pressure

 

3.3 - Coalescing Filter Operation

 

3.4 - Dryer Operating Sequence

 

Section 4 - Additional Specifications 

Section 5 - Desiccant  Replacement 

Section 6 - Setting Pump Head Bolt Torque 

Section 7 - Trouble Shooting Guide

 

Section 8 - Dry Air Pac General Arrangement

 

8.1 - General Arrangement for Models DAP 1000 & DAP 2000

 

8.2 - General Arrangement for Models DAP 500

 

Section 9 - Dry Air Pac Electrical Schematics 

Section 10 - 

P&ID Diagram

Section 11

 

-

 

Warranty Policy

1-800-345-8207

Содержание Dry Air Pac DAP1000

Страница 1: ...MODELS DAP500 DAP1000 DAP2000 Model Number System Capacity Compressor HP Dryer Rating SCFM Approximate Shipping Weight DAP500 500 Gallon 2 10 375lbs DAP1000 1000 Gallon 5 20 500lbs DAP2000 2000 Gallo...

Страница 2: ...ronic Drain Valve Section 2 Start Up Instructions Section 3 Operation 3 1 Description of Operation 3 2 Setting Purge Pressure 3 3 Coalescing Filter Operation 3 4 Dryer Operating Sequence Section 4 Add...

Страница 3: ...ow and servicing all major components The unit must be leveled and anchored to the floor the vibration isolators supplied with the unit MUST be utilized If the location is below freezing at any time t...

Страница 4: ...o maintain air drying tower pressure between 70 psig and 100 psig during this period The Dry Air Pac should not run for more than 40 minutes in any given hour If you are connecting to an old piping sy...

Страница 5: ...Section 2 Start Up Instructions As noted previously the unit must run for a minimum of a 1 2 hour before air is taken from the Dry Air Pac into the sprinkler system Follow instructions in section 1 4...

Страница 6: ...device to control system pressure Multiple Riser Installation Set final regulator pressure at least 10 psi above highest pressure Put air maintenance device into fill position 3 4 fill valve open Adj...

Страница 7: ...e Pressure The purge pressure set valve is located between the two tanks just over the top of the control panel This valve is pre set at the factory If it needs to be adjusted for any reason the follo...

Страница 8: ...cle on each tower does not get out of line with normal operation and does not saturate one desiccant bed Purge valves are only open when the compressor runs This minimizes compressor run time The freq...

Страница 9: ...m the tower Replace the plug ensuring the threads are cleaned and re doped with thread sealant before replacing CHECK the condition of the lower desiccant As flow is upward through the bed the lower d...

Страница 10: ...nually to bleed air to force the dryer through a full cycle to ensure that the towers pressurize and repressurize correctly and go through their cycle This is simply a check to see that the unit is op...

Страница 11: ...drain operation Low purge flow Check purge pressure setting Desiccant contamination Check compressor intake is not in an area where chemicals can be drawn into the intake filter with air Check when t...

Страница 12: ...hange filter elements Valve shut Open valve Repressurization Failure or Purge Failure Tower Back pressure Purge flow control valve orifice clogged Clean or replace Failed check valve Replace Purge exh...

Страница 13: ...URE SWITCH COALESCING FILTER 30 GALLON RECEIVER 70 MUFFLERS MOTOR PIGGY BACK FILTER REGULATOR 1 2 FNPT OUTLET TO SYSTEM AIR MAINTENENCE DEVICE 18 12 MOUNTING 3 CONNECT CORRECT SUPPLY VOLTAGE TO STARTE...

Страница 14: ...Section 8 Dry Air Pac General Arrangement cont 8 2 General Arrangement for Models DAP 500...

Страница 15: ...Section 9 Dry Air Pac Electrical Schematics 9 1 Electrical Schematic Wiring Diagram DAP With PLC Option...

Страница 16: ...Section 9 Dry Air Pac Electrical Schematics 9 2 Electrical Schematic Single Phase 115v 60hz or 110v 50hz...

Страница 17: ...Section 9 Dry Air Pac Electrical Schematics 9 3 Electrical Schematic Single Phase 208 230v 60hz or 220v 50hz...

Страница 18: ...Section 10 Dry Air Pac P ID Diagram...

Страница 19: ...IT IS EXPRESSLY AGREED THAT EXCEPT AS TO TITLE THE COMPANY MAKES NO OTHER WARRANTIES EXPRESSED OR IMPLIED OR STATUTORY INCLUDING ANY IMPLIED WARRANTY OR MERCHANTABILITY THE REMEDY PROVIDED UNDER THIS...

Отзывы: