Section 5 - Desiccant Replacement (cont’d)
9. Remove and replace the pre & afterfilter elements prior to putting the unit back in service. This is accomplished by
unscrewing the bowls and following the kit instructions to replace the elements. We would be happy to look at the old
elements if you feel there is any question as to the condition. Please contact the factory for shipping instructions. Replace
the filter bowls and tighten securely prior to re-pressurizing the unit.
10. Turn the power back on to the unit.
11. Close the discharge valve of the unit, and open the valve ahead of the coalescer. Turn power back on to the unit and
allow the unit to repressurize. Check all joints for leaks and tighten if needed.
12. Operate the drain valve manually to bleed air to force the dryer through a full cycle to ensure that the towers
pressurize and repressurize correctly and go through their cycle. This is simply a check to see that the unit is operating
normally. The unit is now ready to go back in operation.
Run the unit for a 1/2 hour as above in INSTALLATION, before letting air feed back into the system.
The purge mufflers must be removed during this 1/2 hour period.
Reinstall the mufflers only after the unit has run for a 1/2 hour.
Once this has been done, valve the unit back into the system.
Should you have any questions, please call the factory and ask for Customer Service at 1-800-345-8207.
Section 6 - Setting Pump Head Bolt Torque
1. Pump head bolts must be torqued to 35 /lbs after 40 hours of run time. Follow the torque sequence pictured below.
Tighten bolts in sequence shown in diagram.
5
6
Torque compressor head bolts to 35 ft/lbs
after 40 hours of service
1
4
3
2
NOTICE
Содержание Dry Air Pac DAP1000
Страница 14: ...Section 8 Dry Air Pac General Arrangement cont 8 2 General Arrangement for Models DAP 500...
Страница 15: ...Section 9 Dry Air Pac Electrical Schematics 9 1 Electrical Schematic Wiring Diagram DAP With PLC Option...
Страница 16: ...Section 9 Dry Air Pac Electrical Schematics 9 2 Electrical Schematic Single Phase 115v 60hz or 110v 50hz...
Страница 17: ...Section 9 Dry Air Pac Electrical Schematics 9 3 Electrical Schematic Single Phase 208 230v 60hz or 220v 50hz...
Страница 18: ...Section 10 Dry Air Pac P ID Diagram...