Section 5 - Desiccant Replacement (cont’d) 

9. Remove and replace the pre & afterfilter elements prior to putting the unit back in service. This is accomplished by
unscrewing the bowls and following the kit instructions to replace the elements. We would be happy to look at the old
elements if you feel there is any question as to the condition. Please contact the factory for shipping instructions. Replace
the filter bowls and tighten securely prior to re-pressurizing the  unit.

10. Turn the power back on to the  unit.

11. Close the discharge valve of the unit, and open the valve ahead of the coalescer. Turn power back on to the unit and
allow the unit to repressurize. Check all joints for leaks and tighten if needed.

12. Operate the drain valve manually to bleed air to force the dryer through a full cycle to ensure that the towers
pressurize and repressurize correctly and go through their cycle. This is simply a check to see that the unit is operating
normally. The unit is now ready to go back in  operation.

Run the unit for a 1/2 hour as above in INSTALLATION, before letting air feed back into the system.

 

The purge mufflers must be removed during this 1/2 hour period. 
Reinstall the mufflers only after the unit has run for a 1/2 hour.

 

Once this has been done, valve the unit back into the  system.

 

Should you have any questions, please call the factory and ask for Customer Service at 1-800-345-8207.

 

Section 6 - Setting Pump Head Bolt  Torque 

1. Pump head bolts must be torqued to 35 /lbs after 40 hours of run time. Follow the torque sequence pictured below.

Tighten bolts in sequence shown in diagram.

 

 5

 

Torque compressor head bolts to 35 ft/lbs 

after 40 hours of service

 

4

 

2

 

NOTICE

 

Содержание Dry Air Pac DAP1000

Страница 1: ...MODELS DAP500 DAP1000 DAP2000 Model Number System Capacity Compressor HP Dryer Rating SCFM Approximate Shipping Weight DAP500 500 Gallon 2 10 375lbs DAP1000 1000 Gallon 5 20 500lbs DAP2000 2000 Gallo...

Страница 2: ...ronic Drain Valve Section 2 Start Up Instructions Section 3 Operation 3 1 Description of Operation 3 2 Setting Purge Pressure 3 3 Coalescing Filter Operation 3 4 Dryer Operating Sequence Section 4 Add...

Страница 3: ...ow and servicing all major components The unit must be leveled and anchored to the floor the vibration isolators supplied with the unit MUST be utilized If the location is below freezing at any time t...

Страница 4: ...o maintain air drying tower pressure between 70 psig and 100 psig during this period The Dry Air Pac should not run for more than 40 minutes in any given hour If you are connecting to an old piping sy...

Страница 5: ...Section 2 Start Up Instructions As noted previously the unit must run for a minimum of a 1 2 hour before air is taken from the Dry Air Pac into the sprinkler system Follow instructions in section 1 4...

Страница 6: ...device to control system pressure Multiple Riser Installation Set final regulator pressure at least 10 psi above highest pressure Put air maintenance device into fill position 3 4 fill valve open Adj...

Страница 7: ...e Pressure The purge pressure set valve is located between the two tanks just over the top of the control panel This valve is pre set at the factory If it needs to be adjusted for any reason the follo...

Страница 8: ...cle on each tower does not get out of line with normal operation and does not saturate one desiccant bed Purge valves are only open when the compressor runs This minimizes compressor run time The freq...

Страница 9: ...m the tower Replace the plug ensuring the threads are cleaned and re doped with thread sealant before replacing CHECK the condition of the lower desiccant As flow is upward through the bed the lower d...

Страница 10: ...nually to bleed air to force the dryer through a full cycle to ensure that the towers pressurize and repressurize correctly and go through their cycle This is simply a check to see that the unit is op...

Страница 11: ...drain operation Low purge flow Check purge pressure setting Desiccant contamination Check compressor intake is not in an area where chemicals can be drawn into the intake filter with air Check when t...

Страница 12: ...hange filter elements Valve shut Open valve Repressurization Failure or Purge Failure Tower Back pressure Purge flow control valve orifice clogged Clean or replace Failed check valve Replace Purge exh...

Страница 13: ...URE SWITCH COALESCING FILTER 30 GALLON RECEIVER 70 MUFFLERS MOTOR PIGGY BACK FILTER REGULATOR 1 2 FNPT OUTLET TO SYSTEM AIR MAINTENENCE DEVICE 18 12 MOUNTING 3 CONNECT CORRECT SUPPLY VOLTAGE TO STARTE...

Страница 14: ...Section 8 Dry Air Pac General Arrangement cont 8 2 General Arrangement for Models DAP 500...

Страница 15: ...Section 9 Dry Air Pac Electrical Schematics 9 1 Electrical Schematic Wiring Diagram DAP With PLC Option...

Страница 16: ...Section 9 Dry Air Pac Electrical Schematics 9 2 Electrical Schematic Single Phase 115v 60hz or 110v 50hz...

Страница 17: ...Section 9 Dry Air Pac Electrical Schematics 9 3 Electrical Schematic Single Phase 208 230v 60hz or 220v 50hz...

Страница 18: ...Section 10 Dry Air Pac P ID Diagram...

Страница 19: ...IT IS EXPRESSLY AGREED THAT EXCEPT AS TO TITLE THE COMPANY MAKES NO OTHER WARRANTIES EXPRESSED OR IMPLIED OR STATUTORY INCLUDING ANY IMPLIED WARRANTY OR MERCHANTABILITY THE REMEDY PROVIDED UNDER THIS...

Отзывы: