background image

General Information and Setup

Owner’s/Installation Manual for SMM

3

Section 2: General Information and Setup

Load Management Options

Load management systems are designed to work
together to prevent a generator from being overloaded by
large appliance loads. Options include:

Smart Management Modules (SMMs)

Smart A/C Module (SACM)—standard in single-
phase 100-800 Amp RTS or RXS transfer
switches.

These options can be used in conjunction or separately.

Application Considerations

Generator overload condition is determined by generator
frequency. Loads are shed when frequency drops below
a preset value for a predetermined time.
A SMM can be used individually or in conjunction with a
SACM to manage a combined total of eight loads. SMMs
operate independently when used in conjunction with the
SACM. 

Use Priorities A/C 1–4 on the SACM as the top pri-
orities, then up to four SMMs as Priorities 5–8.

Use only select A/C priorities on the SACM as the
top priorities, then use additional SMMs as the
remaining priorities.

To reduce the loads returned to the generator all at
once, it is best to set the SMM priorities to follow
after the last HVAC load has returned. This allows
the generator to accept loads gradually, reducing
the potential for additional nuisance load shed
events.

In any combination of modules, the recovery times after a
loss of utility power or shutdown due to overload are
shown in 

Table 2-1

.

NOTE: 

For digital thermostats where a 24 VAC

thermostat wire is not available, an SMM must be used to
break the power at the HVAC load itself.

Smart Management Module (SMM)

Any 240V loads, including central air conditioners, can be
managed using a SMM. The system can accommodate
up to eight individual SMMs.

NOTE: 

SMMs are self-contained and have individual

built-in controllers.

Table 2-1. Priority Settings

Priority

Recovery Time

SACM

SMM

1

5 minutes

Yes

Yes

2

5 minutes 15 seconds

Yes

Yes

3

5 minutes 30 seconds

Yes

Yes

4

5 minutes 45 seconds

Yes

Yes

5

6 minutes 

NA

Yes

6

6 minutes 15 seconds

NA

Yes

7

6 minutes 30 seconds

NA

Yes

8

6 minutes 45 seconds

NA

Yes

Содержание G007000-0

Страница 1: ...RAC COM 1 888 GENERAC 1 888 436 3722 Para espa ol visita http www generac com service support product support lookup Pour le fran ais visiter http www generac com service support product support looku...

Страница 2: ...ii Owner s Installation Manual for SMM 000393a WARNING CANCER AND REPRODUCTIVE HARM www P65Warnings ca gov...

Страница 3: ...ation Considerations 3 Smart Management Module SMM 3 SMM and Carton Contents 4 Setting Lockout 5 Jumper Locations 5 Section 3 Installation Tests Troubleshooting Electrical Specifications 9 Enclosure S...

Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...

Страница 5: ...es The manufacturer cannot anticipate every possible cir cumstance that might involve a hazard The alerts in this manual and on tags and decals affixed to the unit are not all inclusive If using a pro...

Страница 6: ...Introduction and Safety 2 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 7: ...e SACM as the top priorities then use additional SMMs as the remaining priorities To reduce the loads returned to the generator all at once it is best to set the SMM priorities to follow after the las...

Страница 8: ...sitions are LOCKOUT LOAD ON GENER ATOR enabled and LOCKOUT DISABLED See Table 2 2 NOTE Recovery time is based on priority dial settings See Table 2 1 Test Button C Disables contactor output for a spec...

Страница 9: ...ped with two movable jumpers 2 Jumper locations are indicated on the diagram 3 Frequency Jumper default for 60 Hz 4 Mode Selector Jumper identified on control board as Lock Out Jumper position A is de...

Страница 10: ...erator mode or during a first time utility power up for five minutes of initial operation Lockout 30 minutes 3 second flash 3 On 3 Off Generator Module detected an overload while trying to recover fro...

Страница 11: ...the l oad Module now in lockout recovery NO YES Have load shed recovery time a nd module priority time elapsed 1 YES NO Was lockout recovery operation successful YES NO YES NO Notes 1 Refer to the Pr...

Страница 12: ...General Information and Setup 8 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 13: ...ditional information Mounting Instructions Recommended installation is near the electrical panel or appliance load The enclosure has a NEMA 3R rating and can be mounted indoors or outdoors It provides...

Страница 14: ...rce and load lines to transfer switch and SMM NOTE Suitable conduit fittings must be installed in knockout openings when running supply and load wires Height in mm H1 6 17 156 8 H2 2 36 60 Width in mm...

Страница 15: ...ntil power returns during an outage Delay time for post load shed recovery An example configuration is shown below Configurations will vary depending on customer prioritization of loads 1 Set the prio...

Страница 16: ...time delay see Table 2 1 for unit to enable output Load not powered LED flashing 3 second interval This load overloaded the generator while attempting recovery from a shed It is in a 30 minute lockou...

Страница 17: ...Installation Tests Troubleshooting Owner s Installation Manual for SMM 13 This page intentionally left blank...

Страница 18: ...Installation Tests Troubleshooting 14 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 19: ......

Страница 20: ...rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W2929...

Отзывы: