background image

Table of Contents

iv

Owner’s/Installation Manual for SMM

This page intentionally left blank.

Содержание G007000-0

Страница 1: ...RAC COM 1 888 GENERAC 1 888 436 3722 Para espa ol visita http www generac com service support product support lookup Pour le fran ais visiter http www generac com service support product support looku...

Страница 2: ...ii Owner s Installation Manual for SMM 000393a WARNING CANCER AND REPRODUCTIVE HARM www P65Warnings ca gov...

Страница 3: ...ation Considerations 3 Smart Management Module SMM 3 SMM and Carton Contents 4 Setting Lockout 5 Jumper Locations 5 Section 3 Installation Tests Troubleshooting Electrical Specifications 9 Enclosure S...

Страница 4: ...Table of Contents iv Owner s Installation Manual for SMM This page intentionally left blank...

Страница 5: ...es The manufacturer cannot anticipate every possible cir cumstance that might involve a hazard The alerts in this manual and on tags and decals affixed to the unit are not all inclusive If using a pro...

Страница 6: ...Introduction and Safety 2 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 7: ...e SACM as the top priorities then use additional SMMs as the remaining priorities To reduce the loads returned to the generator all at once it is best to set the SMM priorities to follow after the las...

Страница 8: ...sitions are LOCKOUT LOAD ON GENER ATOR enabled and LOCKOUT DISABLED See Table 2 2 NOTE Recovery time is based on priority dial settings See Table 2 1 Test Button C Disables contactor output for a spec...

Страница 9: ...ped with two movable jumpers 2 Jumper locations are indicated on the diagram 3 Frequency Jumper default for 60 Hz 4 Mode Selector Jumper identified on control board as Lock Out Jumper position A is de...

Страница 10: ...erator mode or during a first time utility power up for five minutes of initial operation Lockout 30 minutes 3 second flash 3 On 3 Off Generator Module detected an overload while trying to recover fro...

Страница 11: ...the l oad Module now in lockout recovery NO YES Have load shed recovery time a nd module priority time elapsed 1 YES NO Was lockout recovery operation successful YES NO YES NO Notes 1 Refer to the Pr...

Страница 12: ...General Information and Setup 8 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 13: ...ditional information Mounting Instructions Recommended installation is near the electrical panel or appliance load The enclosure has a NEMA 3R rating and can be mounted indoors or outdoors It provides...

Страница 14: ...rce and load lines to transfer switch and SMM NOTE Suitable conduit fittings must be installed in knockout openings when running supply and load wires Height in mm H1 6 17 156 8 H2 2 36 60 Width in mm...

Страница 15: ...ntil power returns during an outage Delay time for post load shed recovery An example configuration is shown below Configurations will vary depending on customer prioritization of loads 1 Set the prio...

Страница 16: ...time delay see Table 2 1 for unit to enable output Load not powered LED flashing 3 second interval This load overloaded the generator while attempting recovery from a shed It is in a 30 minute lockou...

Страница 17: ...Installation Tests Troubleshooting Owner s Installation Manual for SMM 13 This page intentionally left blank...

Страница 18: ...Installation Tests Troubleshooting 14 Owner s Installation Manual for SMM This page intentionally left blank...

Страница 19: ......

Страница 20: ...rights reserved Specifications are subject to change without notice No reproduction allowed in any form without prior written consent from Generac Power Systems Inc Generac Power Systems Inc S45 W2929...

Отзывы: