Cleaning and maintenance
•
27
Cleaning and maintenance
Note:
Regular and conscientious maintenance increases the service life of
the fresh powder system and provides for a longer continuous coat-
ing quality!
The parts to be replaced during maintenance work are available as
spare parts. These parts can be found in the corresponding spare
parts list!
Daily maintenance
1. Clean the injector (see therefore the user manual of the OptiFlow
injector)
2. Clean the powder hose; Please also review the section "Color
change"
Weekly maintenance
1. Clean the fluidizing/suction unit with compressed air. Place the
fluidizing/suction unit back into the powder shortly before restart-
ing operation
2. Check the control unit grounding connections to the coating
booth, the suspension devices of the work pieces, or the convey-
or chain
If in disuse for several days
1. Separate from power mains
2. Clean the Fresh powder system
3. Turn off the compressed air main supply
Powder hose rinsing
If longer downtimes take place, the powder hose has to be cleaned.
Procedure:
1. Disconnect the powder hose from the hose connection on the in-
jector
2. Blow through the hose manually with a compressed air gun
3. Connect the powder hose again to the hose connection on the in-
jector
Содержание OptiFlex 2 V
Страница 12: ......
Страница 18: ......
Страница 22: ......
Страница 26: ...V 03 13 24 Initial start up OptiFlex 2 V 11 12 13 14 15 16 17 18 19 20 21 ...
Страница 28: ......
Страница 32: ......
Страница 36: ...V 03 13 ...