12 Commissioning
12 Commissioning
CAUTION
Protect against leakage!
●
Check the tightness of the media con-
nections prior to commissioning!
●
Provide precautionary measures
against exceeding the maximum per-
mitted pressures caused by pressure
surges.
Prior to cleaning or commissioning the plant:
1. Check the tightness and the function of the pilot solenoid
valves.
2. If the plant is new and after repairs blow out the piping
system with a fully opened pilot solenoid valve (to remove
any harmful foreign matter).
Cleaning:
–
The plant operator is responsible for selecting the
cleaning material and performing the procedure.