Levelling the base frame
Fig.7:
Grouting details
1
Self-levelling grout
2
Adjusting bolts (4x)
3
Washer
4
Temporary barrier strip around and inside frame
5
Complete cured concrete block
6
Grout layer
After the anchor filling mortar has completely cured the frame should be levelled
with a space between block and lower frame flange of 3 - 5 mm*. This space is
necessary for levelling using the base frame adjusting bolts with metal washers
(supplied separately). The base frame should be levelled on each frame side.
Adjust the frame on each adjusting place until all frame sides are horizontal.
This space largely depends on the sort of grout or mortar used. Determine this
space according to the instructions of the grout or mortar supplier.
Finishing with a self-levelling grout
After levelling has been completed the adjusting bolt ends must be greased to
avoid bonding to the self-levelling grout. The space between concrete block and
frame must be completely filled with the self-levelling grout to ensure that the
complete bottom surface of the base frame will be supported. Therefore, it is not
allowed to use shims between concrete base and base frame.
Grouting must be carried out in accordance with the instructions provided by the
grouting supplier. After complete de-aeration of the grouted layer, secure the
base frame by tightening the anchor bolt nuts and remove all adjusting bolts. At
this stage the drive system can be installed. These (accessories) installation
instructions can be found in the order manual.
1.2.5.4 Mounting bare compressor on a concrete block
INSTALLATION AND PREPARATION FOR USE
INSTALLATION
0089288gbr_11
30.10.2017
19
Содержание Grasso V Series
Страница 6: ...0089288gbr_11 6 30 10 2017 ...
Страница 8: ...0089288gbr_11 8 30 10 2017 ...
Страница 10: ...0089288gbr_11 10 30 10 2017 ...
Страница 61: ...Fig 16 Grasso V 6 Pre lubrication valve APPENDIX Product Information PI 0089288gbr_11 30 10 2017 61 ...