Activities to be performed after 3 months (only after initial commissioning
or after a process change)
Component
Activity to be performed
Product contact seals
Check of mechanical parts and visual inspection of
condition
Internal assembly with
bellows
Check of mechanical parts and visual inspection of
condition
Leak test of bellows (bubble test)
Actuator
Function check
Valve
Function check
Feedback
Function check
Pneumatic connections
Check of mechanical parts and visual inspection of
condition
Leak test
Electrical connections
Visual inspection
Activities to be performed once a year
Component
Activity to be performed
Product contact seals
Seal replacement
Internal assembly with
bellows
Check of mechanical parts and visual inspection of
condition
Leak test of bellows (bubble test)
Actuator
Check of mechanical parts and visual inspection of
condition
Function check
Valve
Check of mechanical parts and visual inspection of
condition
Function check
Feedback
Check of mechanical parts and visual inspection of
condition
Function check
Pneumatic connections
Check of mechanical parts and visual inspection of
condition
Leak test
Electrical connections
Check of mechanical parts and visual inspection of
condition
Activities to be performed every 5 years
Component
Activity to be performed
Actuator
Maintenance including seal replacement
Maintenance
Maintenance
430BAL011547EN_2
64
08.07.2019
Содержание Aseptomag AV
Страница 19: ...Fig 6 System divisible for O rings Description 430BAL011547EN_2 08 07 2019 19 ...
Страница 71: ...Appendix 430BAL011547EN_2 08 07 2019 71 ...
Страница 72: ......