Revision A
Transport Pro
9-13
2012659-042
Checkout: Recommended Tests and Checkout Procedures
Video Test Screens
1. Access the Boot Loader program.
2. From the Service Menu, select
Video Test Screens
.
3. Select the first color test (
White Screen
), verify the display is correct
and press the
TRIM KNOB
control to exit the test.
4. Repeat for each of the tests:
Red Screen
Blue Screen
Green Screen
Vertical Bars
5. Select
Exit
.
6. Reboot the monitor.
Brightness Level Test
1. Select
MORE MENUS > MONITOR SETUP > BRIGHTNESS.
2. Verify the display brightness changes when setting the brightness
level from 100% to 10%. Reset the brightness level to your default
setting.
Speaker Test
1. Select
MORE MENUS
>
ALARM CONTROL
>
ALARM VOL.
2. Change the alarm volume to 100%.
3. Verify the speaker volume changes accordingly.
4. Return the volume to the level it was previously set to, before you
changed it for this test.
TRAM Communication Test
1. Confirm that all components of the monitoring system are correctly
connected as described in Chapter 3,
2. Connect the TRAM communication cable to the TRAM module and to
the monitor.
3. Turn on the monitor.
4. Verify that the
Power
indicator illuminates on the TRAM module.
5. Place the TRAM module into the chute.
6. Configure the display with as many waveforms as possible. Refer to
the operator's manual, if necessary.
7. Verify that the waveforms look clean (no noise).
Содержание Transport Pro
Страница 1: ...Transport Pro Patient Monitor Service Manual Software Version 2 2024579 018 Revision A ...
Страница 9: ...Revision A Transport Pro 1 1 2012659 042 1 Introduction ...
Страница 12: ...1 4 Transport Pro Revision A 2012659 042 Introduction Safety Message Definitions ...
Страница 13: ...Revision A Transport Pro 2 1 2012659 042 2 Equipment Overview ...
Страница 28: ...2 16 Transport Pro Revision A 2012659 042 Equipment Overview Theory of Operation ...
Страница 29: ...Revision A Transport Pro 3 1 2012659 042 3 Installation ...
Страница 33: ...Revision A Transport Pro 4 1 2012659 042 4 Configuration ...
Страница 38: ...4 6 Transport Pro Revision A 2012659 042 Configuration Monitor Settings ...
Страница 39: ...Revision A Transport Pro 5 1 2012659 042 5 Maintenance ...
Страница 47: ...Revision A Transport Pro 6 1 2012659 042 6 Troubleshooting ...
Страница 57: ...Revision A Transport Pro 7 1 2012659 042 7 Ordering Parts ...
Страница 59: ...Revision A Transport Pro 7 3 2012659 042 Ordering Parts Exploded View Exploded View 622A ...
Страница 62: ...7 6 Transport Pro Revision A 2012659 042 Ordering Parts Hardware ...
Страница 63: ...Revision A Transport Pro 8 1 2012659 042 8 Disassembly ...
Страница 83: ...Revision A Transport Pro 9 1 2012659 042 9 Checkout ...
Страница 97: ...Revision A Transport Pro A 1 2012659 042 A Technical Specifications ...
Страница 100: ...A 4 Transport Pro Revision A 2012659 042 Technical Specifications External Power Supply ...
Страница 101: ...Revision A Transport Pro B 1 2012659 042 B Electromagnetic Compatibility ...
Страница 109: ......