Critical Power
Modifications reserved
Page 42/53
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Installation Guide TLE Scalable Series 40 - 150 UL S1
4.9.3
Control bus cable location
WARNING !
This installation must be verified by trained personnel before the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.
Keep SELV cables separated from HIGH VOLTAGE cables.
Fig. 4.9.3-1 View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are
placed on the two boards “
P13/P14 – IM0022 –
Bus Interface Board
”
(see Fig. 4.9.3-1).
Fig. 4.9.3-2 View electronic module on intermediate unit
Control bus cables connection
•
Plug the cables
J1A – J2A
(1/2/3/4/5)
and
J1B – J2B
(1/2/3/4/5)
on the connectors
J1A – J2A
and
J1B – J2B
placed
on the two boards “
P13/P14
–
IM0022
–
Bus Interface Board
”
.
•
Fix the communication bus
cables
J1A – J2A
(1/2/3/4/5)
and
J1B – J2B
(1/2/3/4/5)
with
the provided cable clamps.
TLES
_UL
_040
-150
_S1_
RPA
con
nect
ion_
01
EPO
EPO
-
+
XA
Q1
I ON
0
OF
F
POWER MODULE 1
POWER MODULE 2
POWER MODULE 3
RPA
TLES_040-120_S1_R
PA connection_02
J1 J2
B
J1 J2
A
J1A/1
J1A/2÷5
J1B/1
J1B/2÷5