24
C. The control will cycle to the regenerant tank
refill cycle and water will be directed down
through the regenerant line to the regenerant
tank. Let the water flow through the line until
all air bubbles have been purged from the line.
D. Once the air is purged from the line, press the
SET button and the UP button simultaneously
to advance to Treated Water position.
7. Check Regenerant Draw.
A. From the treated water position, initiate a
manual regeneration.
B. The control will begin a manual regeneration,
and advance the control valve to the backwash
cycle. Press the SET and UP button to advance
to regenerant draw/slow rinse cycle.
C. C2 will be displayed. With the control in this
position, check to see that the water is being
drawn out of the regenerant tank. The water
level in the regenerant tank should recede very
slowly.
D. Observe that water is being drawn from the
regenerant tank for at least three minutes.
If the water level does not recede, check all
regenerant line connections for air leaks.
8. If the water level is receding from the regenerant tank,
you can quick cycle the control back to the treated
water position by pressing SET and the UP buttons
simultaneously.
9. Finally, turn on a faucet plumbed after the water
conditioner. Run the faucet until the water runs clear.
10. Add the appropriate amount of regenerant to the
regenerant tank.
The Water Conditioning System
is Now Fully Operational.
Placing 268r Water Conditioning
System Into Operation
(Fill Brine Tank First)
Quick Cycling the Analyzer Control
It is required that the control be quick cycled to specific
regeneration cycles when placing the conditioner into
operation. Please review the following instructions for
quick cycling the control before proceeding to startup.
1. With the control in the treated water position, press
and hold the REGEN button on the control for five
seconds. This will initiate a manual regeneration. The
control will display an hourglass indicating that the
motor and camshaft are turning. The control also
displays the total regeneration time remaining. When
the control reaches the pre-pressurize cycle, the
hourglass is no longer displayed and the motor will
turn off. Pressing the SET button will display the time
remaining for the current cycle.
2. Press and release the UP and SET buttons to move the
control to the next cycle.
Note: The control can be sent directly back to the
treated water position from any regeneration cycle.
Press and hold the UP and SET buttons (about five
seconds) until the hourglass icon appears solid. The
control will now skip all remaining regeneration cycles.
Startup
After you have performed the previous initial power-
up steps, you will need to place the conditioner into
operation. Follow these steps carefully, as they differ from
previous Pro Elite valve instructions.
1. Remove the cover from the valve. Removing the cover
will allow you to see that the camshaft is turning, and
in which cycle the camshaft is currently positioned.
2. With the supply water for the system still turned
off, position the bypass valve to the “not in bypass”
(normal operation) position.
3. Press and hold the REGEN button on the Analyzer
control for five seconds. This will initiate a manual
regeneration. The control will display an hourglass
indicating that the motor and camshaft are turning.
The control also displays the total regeneration time
remaining. When the control reaches the repressurize
cycle (C4), the hourglass is no longer displayed and the
motor will turn off. Pressing the SET button will display
the time remaining for the current cycle.
4. Press and release SET and UP simultaneously to
advance to each cycle.
5. Advance the control to the Backwash cycle (C1). See
Cycle Sequence Table.