C.  The control will cycle to the regenerant tank 

refill cycle and water will be directed down 

through the regenerant line to the regenerant 

tank. Let the water flow through the line until 

all air bubbles have been purged from the line.

D.  Once the air is purged from the line, press the 

SET button and the UP button simultaneously 

to advance to Treated Water position.

7.  Check Regenerant Draw.

A.  From the treated water position, initiate a 

manual regeneration.

B.  The control will begin a manual regeneration, 

and advance the control valve to the backwash 

cycle. Press the SET and UP button to advance 

to regenerant draw/slow rinse cycle.

C.  C2 will be displayed. With the control in this 

position, check to see that the water is being 

drawn out of the regenerant tank. The water 

level in the regenerant tank should recede very 

slowly.

D.  Observe that water is being drawn from the 

regenerant tank for at least three minutes. 

If the water level does not recede, check all 

regenerant line connections for air leaks. 

8.  If the water level is receding from the regenerant tank, 

you can quick cycle the control back to the treated 

water position by pressing SET and the UP buttons 

simultaneously.

9.  Finally, turn on a faucet plumbed after the water 

conditioner. Run the faucet until the water runs clear.

10.  Add the appropriate amount of regenerant to the 

regenerant tank.

The Water Conditioning System  

is Now Fully Operational.

Placing 268r Water Conditioning 

System Into Operation  

(Fill Brine Tank First)

Quick Cycling the Analyzer Control

It is required that the control be quick cycled to specific 

regeneration cycles when placing the conditioner into 

operation. Please review the following instructions for 

quick cycling the control before proceeding to startup.
1.  With the control in the treated water position, press 

and hold the REGEN button on the control for five 

seconds. This will initiate a manual regeneration. The 

control will display an hourglass indicating that the 

motor and camshaft are turning. The control also 

displays the total regeneration time remaining. When 

the control reaches the pre-pressurize cycle, the 

hourglass is no longer displayed and the motor will 

turn off. Pressing the SET button will display the time 

remaining for the current cycle.

2.  Press and release the UP and SET buttons to move the 

control to the next cycle. 

Note: The control can be sent directly back to the 

treated water position from any regeneration cycle. 

Press and hold the UP and SET buttons (about five 

seconds) until the hourglass icon appears solid. The 

control will now skip all remaining regeneration cycles.

Startup

After you have performed the previous initial power-

up steps, you will need to place the conditioner into 

operation. Follow these steps carefully, as they differ from 

previous Pro Elite valve instructions.
1.  Remove the cover from the valve. Removing the cover 

will allow you to see that the camshaft is turning, and 

in which cycle the camshaft is currently positioned.

2.  With the supply water for the system still turned 

off, position the bypass valve to the “not in bypass” 

(normal operation) position.

3.  Press and hold the REGEN button on the Analyzer 

control for five seconds. This will initiate a manual 

regeneration. The control will display an hourglass 

indicating that the motor and camshaft are turning. 

The control also displays the total regeneration time 

remaining. When the control reaches the repressurize 

cycle (C4), the hourglass is no longer displayed and the 

motor will turn off. Pressing the SET button will display 

the time remaining for the current cycle.

4.  Press and release SET and UP simultaneously to 

advance to each cycle.

5.  Advance the control to the Backwash cycle (C1). See 

Cycle Sequence Table.

Содержание Pro Elite 268-716-150-1248

Страница 1: ...Pro Elite Professional Series Water Treatment System by GE Operation Manual Pro Elite Analyzer...

Страница 2: ...Cursors 17 Button Functions 17 Programming Overview 18 Analyzer Control Operation 18 Level I Programming 18 Level l Programming Analyzer Conditioner 19 Level II Programming P Values 20 Programming the...

Страница 3: ...d to minimize the amount of regenerant brine and water used in its operation Efficiency rated water softeners shall have a rated salt efficiency of not less that 3350 grains of total hardness exchange...

Страница 4: ...ghtened plumber tape may be used on connections that do not use an O ring seal Do not use pipe dope type sealants on the valve body Do not use pliers or pipe wrenches Do not use petroleum based lubric...

Страница 5: ...x 36 48 3 x 91 5 cm 19 x 36 48 3 x 91 5 cm Salt Storage 240 lbs 109 kg 240 lbs 109 kg 240 lbs 109 kg Drain Water Rate 2 7 gpm 10 2 L m 3 9 gpm 14 7 L m 3 9 gpm 14 7 L m Service Connection Size 1 NPT 1...

Страница 6: ...conditioner be installed in a protected environment When installing the water conditioning system outdoors several items must be considered Moisture The valve and control are rated for NEMA 3 locatio...

Страница 7: ...nism 3 Jacket Resin Tank 11 Tank Collar 4 Base 12 Riser Tube 5 268 Logix PE Valve w 716 Control 13 Upper Basket 6 Resin Tank 14 Cover 7 Door Access Sensor 15 Shield 8 Sensors Wired Probes Brine Tank 1...

Страница 8: ...8 Equipment Installation Dimensions 36 9 938 1 60 7 1541 6 28 2 715 9 32 2 817 5 53 4 1356 6 55 1398 1 5 0 127 2 5 63 5...

Страница 9: ...Floor Drain Figure 1 Standard Basement Before Installation Cold water lines shown Soft Water Hard Water Outside Faucet Outside Faucet Bath Tub Lavatory Toilet Kitchen Laundry Tubs Pump or Meter Hot W...

Страница 10: ...y the cover aside for now To Assemble the Media Tank 1 If the floor under the media tank is uneven the leveling feet may be installed Slowly lay the tank on its side Press or tap the feet into the poc...

Страница 11: ...B Y P A S S B Y P A S S Water Conditioner Water Conditioner In Out In Out Figure 7 Model 1265 Bypass Included Water Conditioner Water Conditioner Water Conditioner Water Conditioner Normal Operation I...

Страница 12: ...drain line connection This will provide an adequate siphon trap Tie or wire the hose in place at the drain point Also provide an air gap of at least 1 1 2 inch between the end of the hose and the drai...

Страница 13: ...ure hose in place Drain Air Gap Figure 12 Electrical Connection Note There are no user serviceable parts in the AC adapter motor or the control board The Analyzer control operates on a 12 volt alterna...

Страница 14: ...enerant draw is completed when the air check closes Slow Rinse Downflow Cycle C3 Water flow moves the regenerant through the resin at a specific rate and rinses to the drain The resin is regenerated R...

Страница 15: ...optical sensor which is rotated approximately 90 degrees out of phase Note If electrical power is not available the camshaft can be rotated counterclockwise by hand if the motor is removed Cycle Indic...

Страница 16: ...sed such as those sold for commercial laundries adjust the dosage accordingly 1 Dosage Polystyrene resin 1 2 fluid ounce 35 5 mL per cubic foot Non resinous exchangers 0 8 fluid ounce 23 7 mL per cubi...

Страница 17: ...as a solid icon during regeneration 12 When hourglass is flashing this indicates that the control is moving to a regeneration cycle Appears as a solid icon during a cancelled regeneration and the cont...

Страница 18: ...formation in memory for 8 to 24 hours depending on the installation If the super capacitor is exhausted the Analyzer control will display four dashes immediately upon power up The Time of Day and Day...

Страница 19: ...ress then or press press then PM Cubic feet 1 0 to 2 0 Lbs ft 3 Time Day Regeneration Time Day Time Day Regeneration Time Day Time Day Regeneration Time Day Time Day Regeneration Time Day Time Day Reg...

Страница 20: ...lt Setting 3 18 50 290 1 10 9 110 Lbs Cu ft3 g L Set in Level I Programming P7 Capacity View Only 1 140 0 1 14 0 1 0 1 Calculated Kilograins Kilograms Values dependent on P9 setting P8 Not Used P9 Uni...

Страница 21: ...Flow rate dictated by size of drain line flow controller C2 Regenerant Draw Not Adjustable 1 Min See Notes Automatically calculated from resin volume and salt dosage settings C3 Slow Rinse 0 200 1 Min...

Страница 22: ...n for three seconds while H4 number of regenerations since last reset is being displayed will reset the numbers stored in H4 H5 H6 H7 and H8 Holding the set key down for three seconds while H9 months...

Страница 23: ...rol reaches the backwash cycle the hourglass is no longer displayed and the motor will turn off Pressing the SET button will display the time remaining for the current cycle 4 Fill the media tank with...

Страница 24: ...h the control in the treated water position press and hold the REGEN button on the control for five seconds This will initiate a manual regeneration The control will display an hourglass indicating th...

Страница 25: ...her regeneration Advance the controller to the brine refill position C8 to prime the line between the regenerant tank and the valve conditioner only A Slowly open the main water supply valve again to...

Страница 26: ...immediate manual regeneration A solid regeneration icon will be displayed The control will immediately begin a regeneration Delayed Second Regeneration Pressing and releasing the REGEN button while th...

Страница 27: ...27 Pro Elite Valve Exploded View and Parts List BYPASS BYPASS 20 21 22 23 24 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 11 12...

Страница 28: ...18 1010154 O Ring Tank 1 4000585 Skirt Pro Elite Lt Gray 1 19 1232370 O Ring Riser Tube 1 8 1000811 Transformer 120 VAC 60 Hz N American Plug 1 20 4001033 Probe Cable Clips Kit 1 9 3019221 Motor Optic...

Страница 29: ...29 19 21 22 23 24 25 2 3 4 5 6 7 9 10 12 13 14 15 16 17 18 11 Conditioner Tank and Regenerant Tank Assembly Exploded View and Parts List 1 A A A 26 20 8 27 28 5 26 29...

Страница 30: ...tton GE Logo 1 4 1 26 1234170 Screw 8 18 x 9 16 Type 25 4 10 4000347 Cover Brine Tank Pro Elite 1 27 4001265 Washer Countersunk Finishing SS 4 11 4000348 Collar Brine Tank Pro Elite 1 28 4001266 Screw...

Страница 31: ...CH15024 Cap Brine Well 4 Dia Caplug STP 4 1 6 60068 8 06 Brine Float w One Grommet As Purchased 1 7 60002 27 Air Check Assembly 1 8 BR10332 Tubing Insert Brass 2 CH20774 Overflow Fitting Assembly 1 CH...

Страница 32: ...ical sensor is connected and in place Verify that motor gear has engaged cam gear If everything is connected try replacing in this order 1 Wire harness motor optical sensor assembly 2 Control Camshaft...

Страница 33: ...ing to instructions b Remove restriction c Clean injector and screen d Replace injector and cap Contact dealer e Remove foreign matter from disc and check disc for closing by pushing in on stem Replac...

Страница 34: ...Pentair Residential Filtration LLC 5730 North Glen Park Road Milwaukee WI 53209 4454 USA 262 238 4400 Phone 262 238 4402 Fax 2011 Pentair Residential Filtration LLC P N 4001051 Rev D MR14...

Отзывы: