—
63
—
Operation procedures/pictures
Screw
Disassembling the cabinet assembly
Screw off the 8 tapping screws on the cabinet,
chassis and condenser sideboard to take off
the cabinet assembly as shown in Fig. 8-64.
Cabinet assembly
Fig. 8-64
Disassembling the electric box
Screw off the screws fixing the electric device
installation board, and pull out the inserting
contacts for leads of compressor and fan
motor, and remove the electric device
installation board as shown in Fig. 8-65.
Screw
Fig. 8-65
Disassembling rear sideboard
Screw off the screws (14 pieces) that fix the
rear sideboard, valve support and chassis
assembly and lift it upward to take off the rear
sideboard as shown in Fig. 8-66, 8-67.
Screw
Fig. 8-66
Fig.8-67
Rear
sideboard
Frame for
electromagnetic valve
Содержание PRO AIR 107
Страница 2: ... 1 Summary and features Model Remark PRO AIR 107 IN PRO AIR 107 OUT 1Ph 230V 50Hz R410A 1 ...
Страница 4: ... 3 Model Remark PRO AIR 218 IN PRO AIR 218 OUT 1Ph 230V 50Hz R410A ...
Страница 5: ... 4 Model Remark GE AIR 326 IN1 GE AIR 326 IN2 GE AIR 326 OUT 1Ph 230V 50Hz R407C ...
Страница 6: ... 5 Model Remark GE AIR 428 IN GE AIR 428 OUT 1Ph 230V 50Hz R407C ...
Страница 20: ... 19 4 2 Outline and installation dimensions of indoor unit 20 Handle 60cm Bolt Nut Spanner ...
Страница 21: ... 20 4 3 Outline and installation dimensions of indoor units 25 32 Handle Unit mm 500 Bolt Nut Spanner ...
Страница 71: ... 70 Explosive view and parts list Explosive view of parts and components of indoor unit 9 ...
Страница 75: ... 74 Explosive view of parts and components of outdoor unit ...
Страница 77: ... 76 Explosive view of parts and components of outdoor unit frequency converter ...
Страница 79: ... 78 Explosive view of parts of outdoor unit one driving two ...
Страница 81: ... 80 Explosive view of parts of outdoor unit one driving three ...
Страница 83: ... 82 Explosive view of parts of outdoor unit one driving four ...
Страница 101: ... 100 ...