P50 Agile P253
11 Commissioning Instructions
P253/EN M/C
11-5
2.1.6
Opto Output status check
The
Opto O/P
cell under
SYSTEM DATA
menu can be used to monitor the status of the relay outputs.
The cell is a binary string that displays the status of the relay outputs where '1' means energised and
'0' means de-energised. The cell indicates the status of the output relays when the IED is in service.
You can check for relay damage by comparing the status of the output contacts with their associated
bits.
Note: When the Test Mode cell is set to Contacts Blocked, the relay output status indicates which contacts
operate if the IED is in-service. It does not show the status of the output relays, as they are blocked.
2.1.7
Commissioning Test Equipment Required
At the time of commissioning the P253 the following test equipment is required as a minimum:
•
Current injection test kit
•
Multimeter with suitable AC current range and DC voltage range
•
Timer with precision 1 ms
•
Required auxiliary supply
•
Connecting wire, as per required length extension board
•
A portable PC, installed with appropriate software (P50 Agile Configurator)
2.1.8
Battery Check
If the relay is losing its time or date settings, or you are receiving an RTC Error message, you will need
to check the internal battery. To check, follow the steps listed below:
•
Remove all the electrical connection (like SCADA system, current inputs, voltage inputs, etc.)
from the relay terminals.
•
Reconfigure date and time setting by using the feather touch keys.
•
After re-configuring the date and time, switch OFF the relay for some time by disconnecting the
auxiliary supply.
•
Switch the relay ON to check the date and time. If you are still receiving the RTC Error
message, replace the lithium coin battery. (Refer to the instructions in the Maintenance and
Troubleshooting chapter)
2.1.9
External Circuitry Check
Check the relay wiring on the back terminal of relay against the appropriate wiring diagram:
•
CT secondary must be connected to the relay 1A or 5A. All CT wiring screws should be properly
tightened.
Warning:
An open circuit of the CT secondary wiring can cause high voltage which
may be lethal and could damage insulation.
•
The external supply can be wired to the relay auxiliary supply terminals with proper polarity
marking. See the terminal sticker at the top of the relay for more information. The supply range
is mentioned under the front flap covering the USB port connection. Make sure that the auxiliary
supply is in range before energizing the relay.
Содержание P50 Agile P253
Страница 3: ...P50 Agile P253 1 Introduction P253 EN M C 1 1 INTRODUCTION CHAPTER 1 ...
Страница 4: ...1 Introduction P50 Agile P253 1 2 P253 EN M C ...
Страница 11: ...SAFETY INFORMATION CHAPTER 2 ...
Страница 12: ...Safety Information Pxxx 2 ...
Страница 23: ...P50 Agile P253 3 Hardware Design P253 EN M C 3 1 HARDWARE DESIGN CHAPTER 3 ...
Страница 24: ...3 Hardware Design P50 Agile P253253 3 2 P253 EN M C ...
Страница 28: ...3 Hardware Design P50 Agile P253253 3 6 P253 EN M C E00276 Figure 2 Hardware design overview ...
Страница 32: ...3 Hardware Design P50 Agile P253253 3 10 P253 EN M C ...
Страница 33: ...P50 Agile P253 4 Front Panel P253 EN M C 4 1 FRONT PANEL CHAPTER 4 ...
Страница 34: ...4 Front Panel P50 Agile P253 4 2 P253 EN M C ...
Страница 39: ...P50 Agile P253 4 Front Panel P253 EN M C 4 7 Figure 2 USB port ...
Страница 40: ...4 Front Panel P50 Agile P253 4 8 P253 EN M C ...
Страница 41: ...P50 Agile P253 5 Configuration P253 EN M C 5 1 CONFIGURATION CHAPTER 5 ...
Страница 42: ...5 Configuration P50 Agile P253 5 2 P253 EN M C ...
Страница 154: ...5 Configuration P50 Agile P253 5 114 P253 EN M C ...
Страница 155: ...P50 Agile P253 6 Protection Functions P253 EN M C 6 1 PROTECTION FUNCTIONS CHAPTER 6 ...
Страница 156: ...6 Protection Functions P50 Agile P253 6 2 P253 EN M C ...
Страница 181: ...P50 Agile P253 7 Protection Parameter Settings P253 EN M C 7 1 PROTECTION PARAMETER SETTINGS CHAPTER 7 ...
Страница 182: ...7 Protection Parameter Settings P50 Agile P253 7 2 P253 EN M C ...
Страница 203: ...P50 Agile P253 8 Monitoring Control P253 EN M C 8 1 MONITORING CONTROL CHAPTER 8 ...
Страница 204: ...8 Monitoring Control P50 Agile P253 8 2 P253 EN M C ...
Страница 222: ...8 Monitoring Control P50 Agile P253 8 20 P253 EN M C ...
Страница 223: ...P50 Agile P253 9 SCADA Communications P253 EN M C 9 1 SCADA COMMUNICATIONS CHAPTER 9 ...
Страница 224: ...9 SCADA Communications P50 Agile P253 9 2 P253 EN M C ...
Страница 249: ...P50 Agile P253 10 Installation P253 EN M C 10 1 INSTALLATION CHAPTER 10 ...
Страница 250: ...10 Installation P50 Agile P253 10 2 P253 EN M C ...
Страница 259: ...P50 Agile P253 11 Commissioning Instructions P253 EN M C 11 1 COMMISSIONING INSTRUCTIONS CHAPTER 11 ...
Страница 260: ...11 Commissioning Instructions P50 Agile P253 11 2 P253 EN M C ...
Страница 270: ...11 Commissioning Instructions P50 Agile P253 11 12 P253 EN M C ...
Страница 271: ...P50 Agile P253 12 Maintenance and Troubleshooting P253 EN M C 12 1 MAINTENANCE AND TROUBLESHOOTING CHAPTER 12 ...
Страница 272: ...12 Maintenance and Troubleshooting P50 Agile P253 12 2 P253 EN M C ...
Страница 281: ...P50 Agile P253 13 Technical Specifications P253 EN M C 13 1 TECHNICAL SPECIFICATIONS CHAPTER 13 ...
Страница 282: ...13 Technical Specifications P50 Agile P253 13 2 P253 EN M C ...
Страница 292: ...13 Technical Specifications P50 Agile P253 13 12 P253 EN M C ...
Страница 293: ...P50 Agile P253 14 Wiring Diagrams P253 EN M C 14 1 WIRING DIAGRAMS CHAPTER 14 ...
Страница 294: ...14 Wiring Diagrams P50 Agile P253 14 2 P253 EN M C ...
Страница 296: ...14 Wiring Diagrams P50 Agile P253 14 4 P253 EN M C 2 WIRING DIAGRAM Figure 1 P253 wiring diagram ...
Страница 297: ......