PS for Mega SW & RRX provides three kinds of input voltage to Regulator Box through the
filters in the System Cabinet Interface Board(SCIF). But the cables from the SCIF
connectors to Regulator Box are very long, which will surely cause voltage drop on the
cables. The input voltage of Regulator Box must be within the required range with the
voltage drop. So the system uses two exactly identical cables and connectors to decrease
the voltage drop. The output power cables from Regulator Box to Mega SW are also two
exactly identical cables.
•
Current SV system doesn
’
t have the individual 12V Power Supply, which is for future use
to support MNS. That is why 3 out of 4 input LEDs and 5 out of 6 output LEDs are lit in the
Regulator Box.
•
There are five voltage regulators to transform three kinds of input voltage to five kinds of
output voltage. Voltage Regulator Board monitors all regulated voltages using
comparator chips and sends status information (Power Good) to Mega Switch. Only when
all five regulator outputs are normal, then Power Good signal is Ok, which is a DC signal
ranged in 2.2 to 3.3V at pin 19 of J2.
•
In the Mega Switch, the regulator just transforms the 6.85V input voltage to other three
kinds of output voltage. Mega SW also monitors the output voltage and send status
information, and this status information and Power Good signal will be sent to a logic
AND gate to get the Mega SW Power Good signal. Only when output of Voltage Regulator
Box and Regulator in Mega SW are both normal, the Mega SW Power Good signal is OK.
But this signal is not sent to RRX in SV system.
•
Other input voltages to Mega SW except 6.85V just go through the Mega SW and are
directly sent to RRX.
Содержание OPTIMA MR360
Страница 3: ...1...
Страница 4: ...2...
Страница 5: ...3...
Страница 7: ...5...
Страница 8: ...6...
Страница 11: ...9 The portable GasWatch2 Oxygen sensor as pictured above part number is 5111049...
Страница 14: ...12...
Страница 15: ...13...
Страница 16: ...14...
Страница 17: ...15...
Страница 18: ...16...
Страница 20: ...18...
Страница 21: ...19...
Страница 29: ...27 The trough on the newly designed Front Bridge is used to holding the cable track on the bottom of the cradle...
Страница 33: ...31...
Страница 38: ...36...
Страница 39: ...37...
Страница 41: ...39...
Страница 43: ...41...
Страница 44: ...42...
Страница 45: ...43...
Страница 47: ...45...
Страница 48: ...46...
Страница 49: ...47...
Страница 50: ...48...
Страница 51: ...49...
Страница 52: ...50...
Страница 53: ...51...
Страница 54: ...52...
Страница 55: ...53...
Страница 56: ...54...
Страница 62: ...60...
Страница 65: ...63...
Страница 66: ...64...
Страница 67: ...65...
Страница 68: ...66...
Страница 69: ...67...
Страница 71: ...69...
Страница 78: ...Image can be previewed in this new version of Image Management 76...
Страница 79: ...77...
Страница 80: ...78...
Страница 81: ...79...
Страница 82: ...80...
Страница 83: ...You can access the same diagnostic items by System Function or Hardware Location Their functions are same 81...
Страница 85: ...83...
Страница 88: ...86...
Страница 89: ...87...
Страница 90: ...88...
Страница 91: ...89...
Страница 96: ...94...
Страница 97: ...95...
Страница 102: ...100 This slide shows the detailed configuration of THTF host...
Страница 104: ...102...
Страница 105: ...103...
Страница 106: ...104...
Страница 110: ...108 MPS Magnet Power Supply is for ramping up power supply It will have no output after E stop contactor is tripped...
Страница 112: ...110...
Страница 116: ...114...
Страница 117: ...115...
Страница 124: ...122...
Страница 129: ...127...
Страница 131: ...129...
Страница 134: ...132 The part is the 200V DC power supply for three XFAs and 200V to 700V DC DC power supply...
Страница 135: ...133...
Страница 136: ...134 Three sets of DC700V and 700V are isolated...
Страница 142: ...140...
Страница 143: ...141...
Страница 147: ...145...
Страница 150: ...148...
Страница 154: ...152...
Страница 166: ...164 This table shows all the scan mode which the HNA AA and PA have and which elements will be used in different mode...
Страница 170: ...168...
Страница 171: ...169...
Страница 172: ...170...
Страница 174: ...172...
Страница 176: ...174...
Страница 180: ...178...
Страница 181: ...179 Before using the software to do the LVShim LVshim localizer scan must be done to assure the phantom is in the center...
Страница 185: ...183...
Страница 186: ...184...
Страница 187: ...185...
Страница 188: ...186 The report file is stored in export home signa bin...
Страница 189: ...187...
Страница 190: ...188...
Страница 192: ...190 The RF and DC cables for Express PA Coil Cradle mode are shipped with the system...
Страница 193: ...191...
Страница 220: ...Page 2 System Cabinet 1 2 3 4 5 6 2 3 4 5 6 1...
Страница 221: ...Page 3 System Cabinet 1 2 3 4 5 6 1 3 4 2 5 6...
Страница 222: ...Page 4 System Cabinet 1 2 3 4 5 6 4 5 6 2 3 1...
Страница 223: ...Page 5 System Cabinet 1 2 3 4 5 6 7 8 9 10 11 2 3 4 5 6 7 8 9 10 11 1...
Страница 224: ...Page 6 Magnet Side Kit 1 2 3 1 2 3...
Страница 225: ...Page 7 Rear Pedestal 1 2 3 4 5 6 7 4 3 1 2 5 6 7...
Страница 226: ...Page 8 LPCA 1 2 1 2...
Страница 227: ...Page 9 OC Computer 1 2 3 4 5 6 2 3 4 5 6 1...