OEC 9800 Installation Procedure
4
Figure 1
−−−−
9800 C-Arm and 1k x 1k Workstation Enclosures
Depalletization Performed By
Put a check in the appropriate box in the table in the corresponding section of the
9800 Installation Report/Checklist
, 00-879060
(latest version). Note in the Installation Comments section of the
Report/Checklist
if only a Workstation or C-Arm was
depalletized.