
Auto-Configuration
745
Transformer Management Relay
Se
tpoints
http://www.GEindustrial.com/multilin
5–23
GE Multilin
Phase Shifts
The table below provides additional information about the
Phase Shift
column in
Table 5–1: Transformer Types on page 5–11 and represents an assumed ABC phasor
rotation. For transformers connected to a system with a phasor rotation of ACB,
interchange all B (b) and C (c) designations.
Table 5–2: Phase Shifts
Phase
Shift
Input
Phasors
Output
Phasors
Phasor
Transformation
0°
a = A
b = B
c = C
30° lag
a = (A – C) /
b = (B – A) /
c = (C – B) /
60° lag
a = –C
b = –A
c = –B
90° lag
a = (B – C) /
b = (C – A) /
c = (A – B) /
120°
lag
a = B
b = C
c = A
150°
lag
a = (B – A) /
b = (C – B) /
c = (A – C) /
180°
lag
a = –A
b = –B
c = –C
210°
lag
a = (C – A) /
b = (A – B) /
c = (B – C) /
240°
lag
a = C
b = A
c = B
270°
lag
a = (C – B) /
b = (A – C) /
c = (B – A) /
300°
lag
a = –B
b = –C
c = –A
330°
lag
a = (A – B) /
b = (B – C) /
c = (C – A) /
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Содержание Multilin 745
Страница 2: ......
Страница 8: ...Table of Contents 745 Generator Management Relay http www GEindustrial com multilin viii GE Multilin ...
Страница 172: ...S6 Testing 745 Transformer Management Relay Setpoints http www GEindustrial com multilin 5 98 GE Multilin ...
Страница 238: ...GE Multilin Warranty 745 Transformer Management Relay Appendix http www GEindustrial com multilin 8 4 GE Multilin ...