VOLTAGE
is “Enabled”). This setpoint is displayed only if
S2 SYSTEM SETUP
"#
VOLTAGE INPUT
"
VOLTAGE SENSING
is “Enabled”.
•
BREAKERS ARE OPEN SIGNAL
: Select any logic input which, when asserted,
indicates to the 745 that the transformer is de-energized. The selected logic
input should be connected to the auxiliary contacts of the transformer breaker
or disconnect switch.
•
PARALL XFMR BRKR CLS SIGNAL
: Select any logic input which, when
asserted, will indicate to the 745 the onset of sympathetic inrush. The selected
logic input should be connected to the close command going to the parallel
transformer switching device.
FIGURE 5–10: Energization Inhibit Scheme Logic
FIGURE 5–11: Energization Sensing Scheme Logic
Содержание Multilin 745
Страница 2: ......
Страница 8: ...Table of Contents 745 Generator Management Relay http www GEindustrial com multilin viii GE Multilin ...
Страница 172: ...S6 Testing 745 Transformer Management Relay Setpoints http www GEindustrial com multilin 5 98 GE Multilin ...
Страница 238: ...GE Multilin Warranty 745 Transformer Management Relay Appendix http www GEindustrial com multilin 8 4 GE Multilin ...