Installation
1-15
April 2004
Delta F Oxygen Cell
Although the Series 1 accepts other oxygen devices as auxiliary
inputs, it is designed to accept oxygen inputs directly from the Delta F
Oxygen Cell. There are three steps for installing the Delta F Oxygen
Cell: preparing the oxygen cell for operation, calibrating the oxygen
cell, and then connecting the cell to the gas line.
The Delta F Oxygen Cell is available mounted in various types of
enclosures; however, the cell itself will look like either of the cells
shown in Figure 1-6 below. The oxygen cell may have both a bottom
and top drain or only a top drain. It is important to know which drain
the cell has before you install it. Use Figure 1-6 to identify the type of
cell you are using.
Figure 1-6: Delta F Oxygen Cell Drains
Bottom Drain
Top Drain
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание Moisture Image 1 Series
Страница 8: ...Chapter 1 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 52: ...Chapter 2 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 80: ...Chapter 3 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Страница 96: ...Appendix A Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...