![GE MG-101 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/ge/mg-101/mg-101_user-manual_128400013.webp)
MG-101 User’s Manual
5
Chapter 2. Setup and Operation
Chapter 2. Setup and Operation
2.1 Preliminary Setup
IMPORTANT:
Be sure you read and understand
“Initial Considerations” on page 3
before proceeding.
To prepare the MG-101 for operation, complete the following steps:
1.
Remove the back panel by removing the two small screws at the bottom (see
below).
2.
Fill the supplied plastic squeeze bottle with distilled (not deionized) water and connect it to the fill tubing at the
bottom of the saturator bottle (see
below). This length of plastic tubing should be left permanently
attached to the fitting at the bottom of the saturator bottle.
Figure 2: MG-101 Rear View with Panel Removed
Saturator Bottle
Fill Mark
Fill Tubing
Petcock
Screws (2)
Содержание MG-101
Страница 1: ...GE Measurement Control Moisture 910 115 Rev E March 2012 MG 101 User s Manual ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 8: ...Contents vi MG 101 User s Manual no content intended for this page ...
Страница 12: ...Chapter 1 General Information 4 MG 101 User s Manual no content intended for this page ...
Страница 22: ...Chapter 2 Setup and Operation 14 MG 101 User s Manual no content intended for this page ...
Страница 32: ...Warranty 24 MG 101 User s Manual no content intended for this page ...
Страница 33: ......