background image

GEH-1791 

BURDENS 

Burdens  for  the  Type  IJS  relays  are  listed  below. 

The  burden  for  each  circuit 

varies,  depending  upon  the  phase  displacement  of  the  two  voltages,  from  a  minimum  at 

oo  displacement  to  a  maximum  near  1800  displacement. 

VOLTS 

CYCLES 

CIRCUIT 

PHASE 

WATTS 

VOLTS 

POWER 

DIFF. 

AMPS 

FACTOR 

5-6 

00 

3. 00 

11. 6 

0. 258 

115 

60 

5-6 

1800 

3. 76 

12. 0 

0. 313 

7-8 

00 

3. 30 

10. 9 

0. 300 

7-8 

1800 

4. 07 

11. 3 

0. 360 

5-6 

oo 

4. 35 

14. 2 

0. 306 

115 

50 

5-6 

1800 

5. 25 

14. 6 

0. 359 

7-8 

00 

4. 75 

13. 3 

0. 357 

7-8 

1800 

5. 60 

13. 9 

0. 403 

CONSTRUCTION 

The  relay  components  are  mounted  in  a  cradle  assembly  that  is  latched  into  a  drawout 

case  when  th�  relay  is  in  operation,  but  they  can  be  easily  removed  when  desired. 

To  do  this,  the  relay  is  first  disconnected  by  removing  the  connection  plug  that 

completes  the  electrical  connections  between  the  case  blocks  and  the  cradle  block. 

To  test  the  relay  in  its  case,  this  connection  block  can  be  replaced  by  a  test  plug. 
The  cover,  which  is  attached  to  the  front  of  the  relay  case,  contains  an  interlock 

arm  that  prevents  the  cover  from  being  replaced  until  the  connection  plugs  have  been 
inserted. 

The  relay  case  is  suitable  for  either  semi-flush  or  surface  mounting  on  all  panels 

up  to  2  inches  thick,  and  appropriate  hardware  is  available. 

However,  panel 

thickness  must  be  indicated  on  the  relay  order  to  ensure  that  proper  hardware  will 
be  included.  For  outline  and  drilling  dimensions,  see  Figure  15. 

RECEIVING,  HANDLING  AND  STORAGE 

These  relays,  when  not  included  as  part  of  a  control  panel,  will  be  shipped  in 

cartons  designed  to  protect  them  against  damage. 

Immediately  upon  receipt  of  a 

relay,  examine  it  for  any  damage  sustained  in  transit. 

If  injury  or  damage 

resulting  from  rough  handling  is  evident,  file  a  damage  claim  at  once  with  the 
transportation  company  and  promptly  notify  the  nearest  General  Electric  Sales 

Office. 

Reasonable  care  should  be  exercised  in  unpacking  the  relay  in  order  that  none  of  the 
parts  are  injured  or  the  adjustments  disturbed. 

If  the  relays  are  not  to  be  installed  immediately,  they  should  be  stored  in  their 
original  cartons  in  a  place  that  is  free  from  moisture,  dust  and  metallic  chips. 

Foreign  matter  collected  on  the  outside  of  the  case  may  find  its  way  inside  when  the 
cover  is  removed,  and  cause  trouble  in  the  operation  of  the  relay. 

www 

. ElectricalPartManuals 

. com 

Содержание IJS51A

Страница 1: ...Types IJS51A and IJS52A INSTRUCTIONS SYNCHRONISM CHECK RELAYS GEH 179111 GE Meter and Control 205 Great Valley Parkway Malvern PA 19355 0715 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 2: ...ENS 6 CONSTRUCTION 6 RECEIVING HANDLING AND STORAGE 6 ACCEPTANCE TESTS 7 INSTALLATION PROCEDURE 7 PERIODIC CHECKS AND ROUTINE MAINTENANCE 8 SERVICING 9 Closing Angle Adjustment 9 Time Characteristics 10 RENEWAL PARTS 10 Cover Photo 8007016 2 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 3: ... be considerably out of phase due to load transfer around the loop that is open at the breaker controlled by the relay Forms of the relay are available with a rated calibration range up to 600 but for settings over 200 consideration should be given to the resulting generator stresses at the instant of closure through existing system impedances as in any other situation involving out of phase closu...

Страница 4: ...le is considered standard however other settings may be made as indicated by the voltage phase angle characteristics shown in Figure 1 The time delay characteristics of the Type IJS relay are obtained primariy by the time dial setting The time dial controls the distance the contacts must travel before closure and hence controls the time delay At No 10 time dial setting the travel is maximum wherea...

Страница 5: ... from 0 2 up to 2 0 amperes at the minimum control voltage If this tap is used with circuits requiring more than 2 amperes there is a possibility that the 7 ohm resistance will reduce the current to so low a value that the proper current may not be obtained The 2 0 ampere tap should be used with circuits that take 2 0 amperes or more at minimum control voltage provided the current does not exceed ...

Страница 6: ...e connection plugs have been inserted The relay case is suitable for either semi flush or surface mounting on all panels up to 2 inches thick and appropriate hardware is available However panel thickness must be indicated on the relay order to ensure that proper hardware will be included For outline and drilling dimensions see Figure 15 RECEIVING HANDLING AND STORAGE These relays when not included...

Страница 7: ...tact when the time dial is set at 0 The contact wipe should be approximately 1 3211 3 Check that the control spring is not deformed and that the spring convolutions at No 5 time dial setting are reasonably concentric ELECTRICAL TESTS Connect the relay as shown in Figure 11 and check the following 1 Check that with at least 115 volts 60 cycle single phase source connected to both operating coils th...

Страница 8: ...o studs 5 6 is adjusted until the synchronizing check unit just closes its contact The difference between the two voltages should agree approximately with the voltage given on the curve shown in Figure 14 for the phase angle used i e 24 volts for 200 closing When using connections shown in either Figure 11 or Figure 13 check the operating time at 0 displacement with 115 volts on each coil using th...

Страница 9: ...hould be approximately centered between the poles of the U magnet and drag magnet ELECTRICAL ADJUSTMENTS Closing Angle Adjustment Connect the relay as shown in Figure 11 To make an accurate adjustment of the closing angle a phase shifter and phase angle meter are required along with a means for voltage control Two adjustments are necessary for obtaining a desired closing angle adjustable resistor ...

Страница 10: ...ficient quantities of renewal parts should be kept in stock for the prompt replacement of any that are worn broken or damaged When ordering renewal parts address the nearest Sales Office of the General Electric Company Specify the name of the part wanted quantity required and complete nameplate data including the serial number of the relay If possible give the General Electric requisition number o...

Страница 11: ...nts with Rated Voltage Maintained on One Circuit CONNECTING PLUG AUXIL IARY BRUSH BLOCK TERMINAL BLOCK SHORTING BAR NOTE AF TER ENGAG ING AUXIL IARY BRUSH CONNECTING PLUG TRAVELS 1 4 INCH BEFORE ENGAG ING THE MAIN BRUSH ON THE TERMINAL BLOCK Figure 2 8025039 Cross Section of Drawout Case Showing Position of Auxiliary Brush and Shorting Brush 11 w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 12: ...ic of 60 Cycle Relay 12IJS51A1 With Rated Voltage On Both Circuits With 10 Time Dial Settings Figure 4 8007013 Type IJS51A Relay Unit in Cradle Rear View 9 1 8 1 u J en _ 7 w I 6 0 0 0 0 0 0 50 en 0 z 8 4 w en w 3 I z 2 w a 0 0 0 0 10 0 I i I I c I i lfzo CLOSING ANGLE i I J30 CLOSING ANGLE i I I I j 1 l I u 4 0 gw G v 1 v I i f I f i 1 v J I I v I __ _ V 6oo CLOSING ANGLE i J I 50 40 30 20 10 0 1...

Страница 13: ...age on Both Circuits With 10 Time Dial Settings Sl OUND _j SHADING COILS t l I 1 2 l l 5 6 l 7 I8 OOT REST SHORT F I NGER Figure 9 6305898 3 Internal Connec tions For Type IJS51A Relay Front View I 20 16 12 V 0 0 u I II 8 v 4 v ov 2 i 1 I v I v I v I I I 4 6 TilliE DIAl SETTING i v v 8 10 Figure 8 6400150 2 Operating Time of Type IJS Relay With 200 Closing Angle Time at oo 115 Volts 60 Cycles on B...

Страница 14: ... G CIRCUIT OF oi Hl DEVICE FUNCTION NUMBERS 25 SYNCHRONISM CHECK RE LAY TYPE IJS 278 BUS UNDERVOLTAGE RELAY TYPf HGA14AR 27L LINE UNDERVOLTAGE RELAY TYPF fjGA14AR 52 POWER CIRCUIT BREAKER 52C S CONTROL S ITCH TYPE SB 1 Figure 12 6209561 5 Typical Elementary Diagram of External Connections Type IJS Relays 100 l 90 v i 80 70 I i 0 u 7 t 60 c I __ z I 0 u 50 I 0 _ 1 40 r f 7 I I f __ ll 30 i 20 0 N 7...

Страница 15: ...6MM 4 375T 111MM _L__ l I CUTbUT I I I I I 5 687 144MM 112MM j_ 8 81 223M 2 M I 2 18 r 5MM I I PANEL I FOR PANEL DRILLING SEMI FLUSH MOUNTING FRONT VIE 718 1 8MM TYPICAL DIM 3 0 I 76MM 3 4 DRILL 10 HOLES 19MM PANEL DRILLING FOR SURFACE MOUNTING FRONT VIEW 5 16 18 STUD INCHES MM VIEW SHOWING ASSEMBLY OF HARDWARE FOR SURFACE MTG ON STEEL PANELS Figure 15 6209271 8 Outline and Panel Drilling Dimensio...

Страница 16: ...ST 9 93 200 16 Meter and Control Business Department General Electric Company Protection and Control 205 Great Valley Parkway Malvern Pennsylvania 19355 0715 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 17: ...INSTRUCTIONS GEH 1791 E Supersedes GEH 1791 D SYNCHRONISM CHECK RELAYS TYPES IJS51A AND IJS52A GENERAL fj ELECTRIC w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 18: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Страница 19: ...llel with those of the GES or GXS The IJS is not adaptable to applications in volving continuous loading of the contact circuit since contact welding may result even with contact loadings that are low in relation to the interrupting capacity of the contacts The control should be designed to energize the IJS coils when synchronism is to be checked and to permit the IJS contacts to be the last to co...

Страница 20: ...it energized varies from 3 seconds on the 20 degree setting to 6 seconds on the 6 0 degree setting at the 10 TDS The Model 12IJS51A3 and 12IJS52A7A relays which are designed for use where the closing angle greater than 20 degrees is required provides 20 seconds delay at the 40 degree closing angle setting as shown in Fig 5 It may be adjusted to other closing angles between 20 and 60 degrees with c...

Страница 21: ...Type IJS51A Relay Unit In Cradle Rear View z 9 8 1 w _ 7 Cl Cl z 0 4 u w 3 1 z 2 w 0 0 I 0 I i i 0 0 t t 0 I r I o I l r 0 1 r 0 r r r TTI i I t __j_ ll I I 1 I i I 1 I i i li I i l c u20 CLOSING ANGLE t I I 1 r 1 30 CLOSING ANGLE i lJ I v J I v l _J I I I I I 40 CLOSING ANGLE I i I I I II i I v T I I I H vv l 600 jI I j j J I V CLOSING I ANGLE I I i I I i 50 40 30 20 10 0 10 20 30 40 50 PHASE ANG...

Страница 22: ... SHADING_j l t COILS 1 l I l 1 s v i I 6 TOP RfST l l i l8 BOT REST SHORT FINGER it 8 6305ScJ8 3 Intt mal Connections Fo r Type LTS lA Relay Front View V 0 z o VJ I w 20 1 1 c I f I I lb r 1 i 1 I 12 I r t I I I I 4 rr l t t A 1 I I r J I 1 I _____J_ 4 t r _j I I I I I j tT j I 4 6 10 TIME QiAL SUTING Fig 7 6400150 2 Operatine I ime o Type IJS Relay With 2JO Closing Angle Time At 0 115 Volts 60 Cy...

Страница 23: ...esired To do this the relay is first disconnected by removing the connection plug which completes the electrical connections between the case blocks and the cradle block To test the relay in its case this connection block can be replaced by a test plug The cover which is attached to the front of the relay case contains an inter lock arm which prevents the cover from being replaced until the connec...

Страница 24: ...tion A typical elementary diagram of external con nections is shown in Fig 11 The B contact of 52 in series with only one coil circuit serves to reset the disk and contacts promptly after the circuit breaker closes so that the normal delay is avail able as soon as possible in case the breaker trips again Additional relays undervoltage or reclosing may be considered desirable for prevention of unli...

Страница 25: ...C H E C K R E L A Y T Y P E I J I 2 7 8 BUS U N O E RV O L T AGE R E L A Y T Y PF H A14AR 2 7 L L r N E U N OERVO L T A G E R E L A Y r T Y P flGA 4A l 5 2 POW E R C I RC U I T B R E A KE R 5 Z C S CO N T RO L W I TC H T Y P E 58 l Fig 11 6209561 4 Typical Elementary Diagram Of External Connections Type IJS Relays 100 T I 90 1 80 70 u I 60 1 II 1 I 0 u 50 1 I 5 1 4 0 I l 7 1 3 0 1 f7 I I 20 i 10 I...

Страница 26: ...en the poles of the U magnet and drag magnet ELECTRICAL ADJUSTMENTS Closing Angle Adjustment Connect the relay as shown in Fig 10 To make an accurate adjustment of the closing angle a phase shifter and phase angle meter are required along with a means for voltage control Two adjustments are necessary for obtaining a desired closing angle The right hand adjustable resistor at the top of the frame p...

Страница 27: ...12 223M M 1 5 M M DRI LL El 2 H OLES CUTOUT M AY R EPLACE D R ILLED H OLES O PT I ONAL 2 M M 1 1 6 __ L 7 1 ts Tt tttl t S t3 VIEW SHOWING t8 t A t A ASSEME Y OF HARDwA RE FOR SU RFACE MTG 0 N STEEL PA N EL5 PANEL DRIWNG F SEM J FWSH MOUN TI NG t F RONT VIE W DR I L L 1 0 HOLES 19M M PANEL ORI LUNG FOR 9JRFACE OUNTI NG TF RONT V IE W F i g 14 6 2092 7 1 6 Ou tl i ne And Pa ne l Dr i l l i ng Dimen...

Страница 28: ...N ERA L ELECT R I C COMPANY P O W E R SYST E M S M A N A GEMENT BU SINESS DEPT P HILADELPHIA P A 1 91 4 2 G E N E R A L f j E L E C T R I C 5 80 1 0 6 5 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Отзывы: